240 likes | 350 Views
French Test Site. Athens, 8-10 November. Overview. LFOT an overview Pilot test Stakeholder forum Some preliminary results Current and next activities. LFOT an overview. An eCall system has been developed on two different systems, Windows CE at Danew GS410 ,
E N D
French Test Site Athens, 8-10 November
Overview • LFOT an overview • Pilot test • Stakeholder forum • Some preliminary results • Current and next activities
LFOT an overview • An eCall system has been developed on two different systems, • Windows CE at DanewGS410, • Androidat tactile Tablet, • Database server running MySQL and Apache • Web Site is on line at : http://telefot-set.utbm.fr/ • Survey Tools • Web based questionnaires to be filled by participants • Data analysis tools • Extract relevant information from the data collected
Alerts processing Alerts displayed on the map
Data Spec./collec./Analysis Alerts displayed on the map • Alerts processing
Testingarea • Participants selection • A diversified community of 250 drivers is selected among registered users based on: • Age, Gender, Driving experience, … • Collaboration with SDIS (Service Départementald’Incendie et de Secours) , the responsible of eCall processing in France Testing area
Overview • LFOT an overview • Pilot test • Stakeholder forum • Some preliminary results • Current and next activities
Pilot test • Pilot duration • 11 June 2011 – 30 June 2011 • Number of participants • 15 participants driving in Belfort/Montbeliard city both in urban and highway environments • Piloting of questionnaires • Data are automatically stored and analyzed to check that all RQs can be answered • Latency was evaluated using two techniques, parallel eCall (13.46s) and sequential eCall (6s) • Feedback, issues and solutions • Latency is neither sensitive to the vehicle speed, nor to the distance between the vehicle and the server location • Other minor issues have been solved, e.g., alerts displyed on the map, all ND have the same serial number, ND assignments, …
Overview • LFOT an overview • Pilot test • Stakeholder forum • Some preliminary results • Current and next activities
Stakeholder forum • Opening ceremony of PVF-ITS • 7th of July 2011
Test scenario 3. Send the traffic jam alert 2. Send an alert to report the accident 1. Send an eCall alert (vehicle crashed) 5. Confirm the accident 4. Send the traffic jam alert (APRR)
Overview • LFOT an overview • Pilot test • Stakeholder forum • LFOT execution • Current and next activities
LFOT execution • Duration • 7th of July 2011 – 30 Dec 2011 • Number of participants • 250 participants equipped with GS40 and tablets • Data collection • Data are stored into the database • Data analysis and evaluation of users acceptance • RQ-EC1: Is user acceptance influenced by perceived usefulness of device/function? • RQ-EC2: Is user acceptance influenced by perceived trust in device/function? • RQ-EC3: Is there a change in users’ acceptance over time? • Other RQs such as, drivers age, experience, and gender may have influence on using e-Call function
Preliminary results from SDIS • SDIS are participating into the eCall testing • 50 cars are equipped by NDs • During Sept. 26 interventions, and 22 of emergency calls have been made to confirm the accidents
Overview • LFOT an overview • Pilot test • Stakeholder forum • Some preliminary results • Current and next activities
Preliminary results from SDIS • Implementing functions to automatically extract results according to the research questions • Writing deliverables • Design and operation, expected date 20th December • Results analysis and recommendations, March 2012
Questions & Comments are WELCOME Thanks!