1 / 3

Where to Begin? Electrical instrument panel Design Basics

The accuracy and speed at which the planning and planning phase is completed will have an enormous impact on the assembly phase of the instrument panel building process.

mayankshah
Download Presentation

Where to Begin? Electrical instrument panel Design Basics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Where To Begin? Electrical Instrument Panel Design Basics At the economic Controls Company, our specialty is designing and building electrical control panels for a mess of industries and environments. we will start with anything from a thought to an entire set of drawings/functional specifications, or anything in between. We’ll review the knowledge provided, ask all questions necessary to fill within the gaps, and supply the very best quality product available within the industry. Our initial review is so thorough that we frequently say we'll provide what our customers need, beyond or despite what they invite. Electrical Control Panel Manufacturing has become very complex. Rapidly advancing automation technology alongside increasingly stringent rules and regulations have made it difficult to style the foremost cost-effective, yet robust control solutions. Designing the simplest products requires a well-versed team who is consistently increasing their knowledge domain and adapting what they know of electrical instrument panel design guidelines. With a team of engineers who focuses on instrument panel design, programming, and integration, it's our job to remain up to day on the newest standards, certifications, and technologies. Our staff works closely with customers to make sure that instrument panel design requirements are precisely defined, ensuring an in-depth understanding on all sides, during the planning process. Errors and omissions made within the first steps of the planning can cause significant problems during panel production, or worse, during implementation/startup. Success often comes once you work with a team of engineers that understand the whole process and execute each step efficiently. Control Panel Design Basics There are four main electrical instrument panel design basics, or phases when it involves instrument panel construction: A radical review of all technical documentation and an issue and answer session to fill altogether gaps. Design of the system and production getting to maximize efficiency.

  2. Actual assembly and wiring of the system hardware. Updating all final documentation and a performing very thorough internal control procedure. Phase 1: Technical Q&A Session While each phase is vital, we pride ourselves on our rigorous initial Q&A session, the aim of which is to verify that each facet of the project has been addressed intimately, and establish the electrical instrument panel design guidelines for the project. While control panels designed for a specific industry have unique questions that has got to be answered, at a minimum, each list must contain the subsequent questions: maybe a UL Label or other accepted testing agency required? Are there any local electrical codes that have got to be followed? what's the specified NEMA environmental rating of the control panel? what's the available short current that the instrument panel is going to be designed for? Does the instrument panel get to be designed to satisfy any arc flash category? Phase 2: instrument panel Design & Production Planning These first steps set the pace for the whole project and determine how efficiently the rest of the method will flow. Mistakes at this stage will hinder other steps and should cause projects to fall behind, or to be scrapped completely. To avoid instrument panel design problems, the subsequent steps must be followed and performed correctly: Review the purchaser's sequence of operation / functional specification and/or design requirements. Select all components or verify components selected are correct for the appliance. Produce schematic drawings of the control panel(s) to verify that each one component is going to be wired correctly and to demonstrate how the wiring is going to be implemented. Create a full-scale physical layout to make certain components are accessible for construction and maintenance while still minimizing the specified panel space. Select the precise enclosure and related components to satisfy the required requirements requested by the end-user. Once the physical layout and schematic drawings are complete, components and enclosures are often ordered and, supported lead times, we will determine when panel production can begin. To make this phase more efficient, the economic Controls Company provides an impact panel design questionnaire to all or any customers as a primary step within the overall instrument panel manufacturing process. Completion of the ICC questionnaire helps customers understand the extent of detail necessary to style and build an impact panel. Additionally, it helps our engineers understand exactly what's needed for the top product. Phase 3: instrument panel Production The accuracy and speed at which the planning and planning phase is completed will have an enormous impact on the assembly phase of the instrument panel building process. Panel building can become extremely difficult if there are inaccuracies within the overall design, or if parts and components are ordered or delivered later anticipated. Despite this, problems should arise during the assembly stage which is when it's important to show to experienced employees and standard operating procedures. Having a typical procedure in situ can

  3. leave a neater time solving any instrument panel design problems that suddenly arise. If problems do arise, it's important that the instrument panel team do the following: Use the physical layout and schematic drawings to form notes and mark where problems are coming from. Review the issues with the designer and formulate an answer. Review the marked-up layouts and drawings once solutions are determined with an expert in internal control to elucidate why the planning has changed. Phase 4: instrument panel Quality Assurance It is important that the factory floor technicians understand that producing quality items the primary time, whenever, can streamline processes and build a loyal clientele. a method to take care of quality is to integrate internal control at every step. This ensures that if problems are found, they're addressed early by designers and production employees alike. Our QA team follows strict guidelines when testing each instrument panel. the rules include but aren't limited to: Verifying every component against the bill of materials and verifying it's the right voltage. Grading the looks of the panel and verifying all data on every label is correct. Ensuring every component is mounted securely, pull-testing every wire, and checking for stray wire strands. Conducting a full continuity check on every wire within the panel. Powering up the instrument panel and verifying all voltages and ground planes are within tolerance. Exercising every device to make sure the correct functionality and to verify the wiring schematic was designed correctly. After power-up testing is complete, updating all documentation, logging all discrepancies, completing any final assembly procedures, and applying the right certifications. The instrument panel is now ready for packaging and shipping! The last step for each panel is logging every discrepancy both for the technician’s records and for the component/vendor’s records. Should we discover some sorts of errors are getting more prevalent, we'll perform a root cause analysis to work out what steps are necessary to reverse the trend. The Bottom Line With 35 years of experience, the economic Controls Company maintains the power to supply control panels that meet the requirements of any market. Our ultimate goal is to supply flawless control panels to each customer, every time; and to try to to that, we surround ourselves with a highly skilled and highly trained staff and log data throughout the method . We review the info constantly and act thereon accordingly. that's our differentiator. We aren't a panel shop; we are a lean manufacturing facility who builds custom control panels.

More Related