1 / 7

Using the new Dividers for Gap/Crack scintillators and discussion

Using the new Dividers for Gap/Crack scintillators and discussion. Tile week upgrade session 2013 February 1 st François Vazeille. Little summary of the results Next radiation tests Production and certification. 1. Little summary of the results

mbowers
Download Presentation

Using the new Dividers for Gap/Crack scintillators and discussion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Using the new Dividers for Gap/Crack scintillators and discussion Tile week upgrade session 2013 February 1st François Vazeille • Little summary of the results • Next radiation tests • Production and certification 1

  2. Little summary of the results (See Tile Upgrade meeting 17 June 2011 for details and meetings thereafter) Validation of the ″active base concept″ for HL-LHC offering a non linearity < 0.1%  Luminosity with a safety factor > 10, using 3 transistors and 3 diodes in the 3 last stages. (Tests made with 20 PMTs, 20 passive and 20 active bases: See next slide) 2. Refurbishment and upgrade of the Divider Test Bench able to certify the working of 10 Dividers in a run, including the active components. 2

  3. Validation tests of the concept HV = 700 V Pulse light  PMT output of 1 V Continuous light  currentfrom 0 to 120 µA Tests made using 20 PMTs, 20 old Dividers, 20 new Dividers 1 2 3 19 20 PMT1 PMT2 PMT3  PMT19 PMT20 1 2 3 19 20 For each PMT, systematic comparison of the old Divider and of the new Divider  To wash the possible PMT effects in the study. 3

  4. Transistors Q1, 2, 3 BUT Radiation tests of transistors and diodes still missing. Diodes D1, 2, 3 4

  5. Next radiation tests  First indication • - From Kelbytalk: worst position at the PMT location close to Finger Barrel • about 3 Gy/year at the LHC • At HL-LHC: 3 X 10 (Integrated Luminosity) X 10 (years) = 300 Gy or 30 KRad • without the Safety factors. • Tests made on the LHCb Dividers • [Radiation tests of Preshower electronics components during year 2003, • LHCb 2003-162, CALO, PS (September 26th 2003)] •  on the same HV transistor FMMT458 • - Using Krypton beam at GANIL (France). • - Results for tests up to 87 Krad: • Working kept and no SEL (Single Event Latch-ups).  Promising results … but not following the ATLAS radiation policy. 5

  6.  Next radiation tests fitting the ATLAS policy • On both the transistors and the diodes. • Robust information needed on the last simulations and safety factors • (What are the right ATLAS documents ?) •  To meet the ATLAS experts at CERN the next week. • To take benefit from the AIDA project on various irradiation sites for • neutrons (NIEL), Gammas (TID) and protons (SEL). • Comment: • analog working  SEU (Single Event Upset) not requested • Milestones: June 2013. 6

  7. Production and certification  Number of Dividers ? 4 LB Demonstrators: 4 x 32 (PMTs) = 128 Gap/Crack : 8 (PMTs) x 64 (Modules) x2 (EB) = 1024 10% spares for Gap/Crack: 102 Radiation tests : 66 Already produced : 74  Total of 1250 Dividers. Suite à la discussion ces chiffres vont être repris: probablement les scintillateurs Crack seulement et les Démonstrateurs m dans le LB. • Making: already submitted to several Cies •  Request of production delays and cost estimates of the 3 parts: • PCB, component procurement and implementation, cable connexion. •  Final delivery: milestone November 2013. • Certification • by Clermont-Ferrand in about 2 weeks. 7

More Related