200 likes | 219 Views
This article discusses the stage of the SDLC at which system costs are projected, including planning and analysis, design, implementation, and operation and maintenance.
E N D
The system’s costs are projected at which stage of the SDLC? • Planning and Analysis • Design • Implementation • Operation and Maintenance Answer: (b)
Which of the following is not the essential characteristic of the strategic types of information? • Simulated “what if” information of a short-term nature • Competitive actions • Demographic studies • Customer actions Answer: (a)
Which of the following is not the essential characteristic of Decision Support System? • Output directed to organization personnel at all levels • Comprehensive database • Adaptive system over time • None of these Answer: (d)
In project management, which of the following does not show precedence relationship among the tasks and milestones of the project? • Gantt Chart • PERT • CASE Tools • None of these Answer: (a)
Which of the following is not the layer in data warehouse architecture? • External database layer • Metadata layer • Data staging layer • None of these Answer: (d)
Which of the following is the approach that a data mining tool uses? • Association • Classification • Clustering • All of the above Answer: (d)
In MICR how many digits are available for amount? • 13 • 11 • 10 • 9 Answer: (a)
Real tile gross settlement system is • Net settlement system • Designated–time settlement system • Designated-time net settlement system • None of these Answer: (d)
What is the message flow structure in our RTGS System? • V • Y • L • T Answer: (d)
Which of the following is the queue processing and reordering in RTGS? • FIFO • Bypass FIFO • FIFO with prioritization • All of the above Answer: (d)
Which of the following is not correct for SFMS? • Uses Text messages • Uses server signing PKCs • Uses server encryption PKCs • Access can be restricted to HTTPS Answer: (a)
Which of the following is not the type of smart cards? • Stored Value Cards • Re-loadable and disposable cards • Closed and open stored value cards • All of the above Answer: (d)
In RTGS, IDL is • Intra Day Liquidity • Inter-bank Debit List • Instrument Debit List • None of these Answer: (a)
FEDWIRE is a • Net settlement system • Gross Settlement system • Deferred net settlement system • Deferred gross settlement system Answer: (b)
CHIPS is a (a) Net settlement system (b) Gross settlement system (c) settles in forex currency only (d) a & c both Answer: (a)
Structured Financial Messaging System (SFMS) is for • Inter-bank messaging • Intra Bank messaging • RTGS • All of the above Answer: (d)
Electronically, customers fund can be transmitted across the bank by • CENTRALISED BANKING SYSTEM • SFMS • RTGS • ATMS Answer: (c)
Which of the following is not the basic objective of the System Audit? • Safeguarding assets • Maintaining process integrity • Maintaining data integrity • None of these Answer: (d)
Which of the following functionality can be accomplished by generalized audit software? • Evaluating the quality of data • Evaluating the quality of system processing • Analytical review • All of the above Answer: (d)
Which of the following technique is used for concurrent audit? • Integrated Test facility (ITF) • System Control Audit Review File (SCARF) • Continuous and Intermittent Simulation (CIS) • All of the above Answer: (d)