1 / 22

Dufferin Gold Mine: Targeting First Gold Dore Q1 2014 - Presented by Alain Hupé – President & CEO, Douglas Keating – Min

Learn about Dufferin Gold Mine's corporate objectives and plans for becoming Nova Scotia's next gold producer. Explore the mine's existing infrastructure, past operations, and potential for future production and exploration.

mcclaskey
Download Presentation

Dufferin Gold Mine: Targeting First Gold Dore Q1 2014 - Presented by Alain Hupé – President & CEO, Douglas Keating – Min

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DUFFERIN GOLD MINE Targeting First Gold Dore Q1 2014 Presented by: Alain Hupé – President & CEO Douglas keating – Mine Manager Nova Scotia, CANADA OU3 (FWB) / APP (TSX.V)

  2. Forward-Looking Statements This presentation may contain certain forward-looking statements regarding (i) estimated resources and reserves, (ii) planned production and operating costs profiles, (iii) planned capital requirements and (iv) plans, strategies and corporate objectives. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Ressources Appalaches and Dufferin Resources. The forward-looking statements are inherently uncertain and may therefore differ materially from results ultimately achieved. External and other factors may impact the Company and affect the forward-looking statements in this release since its preparation. Subject to applicable law and stock exchange listing rules, the Company does not intend to publicly update any of the forward-looking statements or any assumptions on which any such forward-looking statement is made. OU3 (FWB) / APP (TSX.V)

  3. Corporate Objectives • Become the next Nova Scotian gold producer • Extend resources • Increase production capacity • Three phase plan : • Phase #1 – Restart gold production at 300 TPD by Q1-2014. • Phase #2 – Production of 20,000 to 25,000 ozof gold per year. • Phase #3 – Explore the anticline structure towards the East and at depth • to double production capacity in 2015 OU3 (FWB) / APP (TSX.V)

  4. Corporate Profile OU3 (FWB) / APP (TSX.V)

  5. 0 20 kilometres Dufferin Mine & Surrounding Appalaches Properties Miller Lake Dufferin East Dufferin North Chocolate Lake Dufferin Mine Ecum Secum Sheet Harbour 25 kilometers (km) radius Halifax Dufferin Mine Canada OU3 (FWB) / APP (TSX.V)

  6. Dufferin Mine Existing Infrastructures • Existing mining infrastructure on site: • Mining lease in good standing • 300 tonnes per day plant • Very short distance from mine to plant (150 m) • Gravity and flotation process • Tailings pound • Acces by decline PORTAL AND DECLINE MILL MILLING OU3 (FWB) / APP (TSX.V)

  7. Dufferin Mine Past and Existing Facilities Ball Mill Shaking Table Flotation System Infrasructure On-site OU3 (FWB) / APP (TSX.V)

  8. Dufferin Mine Past Operations Quartz Vein – Saddle Quartz Vein – Saddle OU3 (FWB) / APP (TSX.V)

  9. Dufferin Mine Past Operations – Type of Veins OU3 (FWB) / APP (TSX.V)

  10. Saddle Reef Vein Deposit Anticline Fold Nose Dufferin Mine Gold Quartz Vein D 20-100 meters 1.4 - 8.4 km Potential continuity in depth and toward east open structure OU3 (FWB) / APP (TSX.V)

  11. Production and Exploration Dufferin Gold Mine Mining Lease no. 94-2 Ressources Appalaches owns claims covering anticline structure over 8.4 km long Area Drilled 1,400 meters Mined Zone 450 meters Deposit Open Towards East and at Depth Portal Wide Quartz Veins Milling Gold Surface Sample OU3 (FWB) / APP (TSX.V)

  12. Drilling Campaigns 2010-2011 1999-2001 2008-2009 OU3 (FWB) / APP (TSX.V)

  13. Dufferin Mine Plan Mine General Layout 700 m APP-TSX-V

  14. Dufferin Mine Plan Mine Plan Potential Resources APP-TSX-V

  15. MilestonesAchieved • Latest Goals Achieved • Past 6 months • Mid-2013: The following works have been completed since the announcement of the loan financing of US $10M (May 2013): • Mine underground dewatering & rehabilitation works • Refurbished the primary and secondary underground ventilation • Completed plant rehabilitation and testing of all crushing circuit components • Finalised and filed mine plan with provincial authorities & filed production permit (Industrial Approval) application • Acquisition and delivery of heavy equipment • Started the vetting of 688 applications for the remaining approximately 70 staffing positions required to resume mining operations OU3 (FWB) / APP (TSX.V)

  16. Portal Flooded – Water Level May 17, 2013 APP-TSX-V

  17. Portal Rehabilitation OU3 (FWB) / APP (TSX.V)

  18. Infrastructures OU3 (FWB) / APP (TSX.V)

  19. Mill Refurbishment OU3 (FWB) / APP (TSX.V)

  20. Galleries Rehabilitation OU3 (FWB) / APP (TSX.V)

  21. Milestones to Achieve • Path to Production • Targeting First Gold Dore Q1 2014 • 2013: Complete development works required to restart production at 300 t/d • 2014: Start of mining & milling ramp-up operations • resume gold production Q1 2014 • post-2014: Reinvest profits to increase resources and upgrade plant capacity OU3 (FWB) / APP (TSX.V)

  22. DUFFERIN GOLD MINE Questions Presented by: Alain Hupé – President & CEO Douglas Keating – Mine Manager October, 2013 OU3 (FWB) / APP (TSX.V)

More Related