1 / 4

Deployment configuration – test 2

This deployment involves geophones and hydrophones in a test setting with specific distances and depths per configuration, including multiple nodes and strings. Shotpoints and ignition points are strategically placed for optimal data collection.

mccue
Download Presentation

Deployment configuration – test 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deployment configuration – test 2 x2 y1 y2 O 750 m x1 O x2 x1 y1 y2 O

  2. Deployment geophones/hydrophones – test 2 375 m 375 m 12,5 m O x1 x2 z 6,25 m 30 nodes each with 2 strings 30 nodes each with 2 strings & 1 hydrophone 375 m 375 m 12,5 m O y1 y2 6,25 m 30 nodes each with 2 strings 30 nodes each with 2 strings Geophone string (8 geophones), length 6,25 m Z: hydrophone at depth z

  3. Shotpoints – test 2 C Distances: A-X2: 25 m, or A-O: 400 m B-X2: 525 m, or B-O: 900 m C-X2: 1025 m, or C-O: 1400 m Hydrophone depths: Z = 5 m, all hydrophones Z = 10 m, all hydrophones Z = 20 m, all hydrophones B A x2 O y2 y1 x1

  4. Shotpoints – test 2 C Ignition point, line sources B 3 shots: 1 2 3 A x2 Shot 1 (all): point 2.5 m Shot 2 (all): point 12.5 m Shot 3 (all): line 12,5 m O y2 y1 x1

More Related