230 likes | 345 Views
FLOOD DISASTER MANAGEMENT. AND. RISK REDUCTION IN BANGLADESH. MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC) Dhaka, September 2004. STRUCTURE OF PRESENTATION. INTRODUCTION TO HALIMA BEGUM FLOOD DISASTER MANAGEMENT OPTIONS FOR DAMAGE REDUCTION
E N D
FLOOD DISASTER MANAGEMENT AND RISK REDUCTION IN BANGLADESH MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC) Dhaka, September 2004
STRUCTURE OF PRESENTATION • INTRODUCTION TO HALIMA BEGUM • FLOOD DISASTER MANAGEMENT • OPTIONS FOR DAMAGE REDUCTION • FLOOD RISK REDUCTION 2
CASE-STUDY OF HALIMA • WIDOW • VICTIM OF RIVER EROSION • LANDLESS • 4 FAMILY MEMBERS • DOMESTIC AID AND POULTRY REARING (ON PROFIT SHARING BASIS) • AVERAGE INCOME IS TK. 15 - 20 PER DAY 3
RELIEF RECEIVED RICE 20 Kgs PULSE 3.75 Kgs OIL, SALT, BISCUIT, CLOTHINGS, ETC. 4
AREAS OF IMPROVEMENT • MONITORING • COORDINATION 5
R&R SUPPORT IN THE PAST 1998 : FOOD, CLOTHING, HOUSE, ETC 1988 : FOOD, CLOTHING, C.I SHEET 1972 - 2004 VGF, GR, FFW, CASH, ETC 6
VICIOUS CYCLE OF DISASTER AND POVERTY POVERTY LINE POVERTY RELIEF AND REHABILITATION VULNERABILITY (RISK) DISASTER 7
OPTIONS X 1. RELOCATION X 2. FLOOD PREVENTION 3. RISK REDUCTION • FLOOD MANAGEMENT (STRUCTURAL MEASURES) • EMPOWERMENT OF THE VULNERABLE PEOPLE 8
VULNERABILITY X RISK = HAZARD CAPACITY RISK ? 9
COMPARISON OF RISKS VALUES : 1 5 (LOWEST HIGHEST) HALIMA : (V) 1 (V) 5 X X RISK = (H) 5 1 (C) JASIM MANDAL : = (H) 5 RISK (C) 5 = 25 = 1 10
RISK =HAZARD CAPACITY VULNERABILITY X DISASTER 11
? CAPACITY ENHANCEMENT OF THE POOR HOW THE MONEY IS SPENT ? • RELIEF AND REHABILITATION • INFRASTRUCTURAL DEVELOPMENT • HIGHLY PAID CONSULTANTS 12
BASIC REQUIREMENT • SUSTAINED LIVELIHOOD • CAPACITY ENHANCEMENT 13
RISK REDUCTION THROUGH SUSTAINABLE LIVELIHOOD SUPPORT • VULNERABILITY AND CAPACITY ASSESSMENT • DEVELOPMENT OF BUSINESS PLAN (FAMILY LEVEL) • SKILL AND CAPACITY DEVELOPMENT • INCOME GENERATING SUPPORT (AT LOW OR NO INTEREST) • LINKAGE WITH SERVICE PROVIDERS 14
INVESTMENT OF A PART OF PROFIT FOR RISK REDUCTION(MINOR STRUCTURAL IMPROVEMENT) • DISSEMINATION OF EARLY WARNING • FAMILY AND COMMUNITY LEVEL PREPAREDNESS • EVACUATION PLAN • FAMILY AND COMMUNITY RESPONSE PLANS 15
PROPOSED STRUCTURE AGENCY : DRR(MFDM) IMPLEMENTATION : UDMC(Through PIC) SUPERVISION : CHANGE AGENTS(IMAMS, TRACHERS, TBAs) RESOURCES : GoB - 80 %DEV. PARTNERS - 20 % 16
RISK REDUCTION SUPPORT PROJECT OUTPUT X 17
OUTPUT Contd. • REDUCTION OF RISK • EMPOWERMENT OF THE POOR • ALLEVIATION OF POVERTY • ACHIEVEMENT OF MDG 19
SMART SUSTAINABLE MEASURABLE ACHIEVABLE REPLICABLE TIME-BOUND 20
CHALLENGE ? • CHANGE OF MIND-SETS OF MAJOR STAKEHOLDERS • A BELIEF IN THE POTENTIAL POWER OF THE POOR • INTEGRATION OF RISK MANAGEMENT INTO DEVELOPMENT PLANNING • SUSTAINED POLITICAL COMMITMENT 21