1 / 6

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Water Project of the Year. City of Arlington Mesa Industrial Park Water System. PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School. Project Summary. $2.3 million wate r and sewer system improvements project to the Arlington Airport and new industrial park area

meagan
Download Presentation

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Project of the Year City of Arlington Mesa Industrial Park Water System PNCWA Operators ConferenceEastern Oregon Region AWWA/PNCWA Short School

  2. Project Summary • $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area • Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system • Funded by the City of Arlington and Gilliam County • The City of Arlington has a shovel-ready industrial park area with full water and sewer system service

  3. Reservoir Construction

  4. Airport Booster Pump Station Piping

  5. 250,000-Gallon Steel Storage Reservoir and Booster Pump Station

  6. Mesa Industrial Park Area

More Related