290 likes | 437 Views
Stormwater Regulations and Programs. Law Permits Watershed Programs. Information available at www.swrcb.ca.gov. Stormwater. Precipitation runoff Runoff contacts roofs, walks, streets, vegetation, roads, and earth Runoff washes off pollutants Pollutants also dissolved in precipitation.
E N D
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at www.swrcb.ca.gov
Stormwater • Precipitation runoff • Runoff contacts roofs, walks, streets, vegetation, roads, and earth • Runoff washes off pollutants • Pollutants also dissolved in precipitation
Sediment Hydrocarbons Metals Trash and Debris Nutrients Typical Pollutants
Typical Concentrations Source: a: 1985 Caltrans Discharge Characterization Report (2003), b: Water Quality (Tchobanoglous and Schroeder), and c: Basin Plan Objectives for various beneficial uses (Central Valley Regional Water Quality Control Board)
Clean Water Act (federal) • Goals: Protecting beneficial uses • Protect fish, shellfish, and wildlife • Protect receiving waters for contact recreation • Prohibit discharge of toxic pollutants • National Pollutant Discharge Elimination System (NPDES) permit required • NPDES is the permitting system used for stormwater and point source discharges
Porter Cologne Act (CA) • Establishes Regional Water Quality Control Boards • Enforces the NPDES system in CA Regional Boards
Stormwater Permits • Construction • Industrial • Municipal Permits require the use of Best Management Practices (BMPs)
BMPs • Non-structural (usually source controls) • Public education • Erosion control • Good housekeeping • Pollution prevention practices related to landscaping, lawn care, vehicle washing, pet waste, street and parking lot cleaning • Structural (treatment): detention basins, sand filters, etc.
Construction Permit • Statewide construction permit (permits not usually specific to region or site) • For all projects that disturb more than one acre • Must file Notice of Intent (NOI) with Regional Board • Must prepare a Storm Water Pollution Prevention Plan (SWPPP) • Implement BMPs
SWPPP • Define project • Map extent of disturbances & discharge points • List pollution prevention measures (BMPs) • Entrance/Exit controls • Erosion control (e.g. slope stabilization, silt fences) • Treatment (e.g. retention and sedimention basins) • Source Controls (e.g. covering materials, concrete wash-out areas)
Slope Stabilization Erosion Control - Hydroseeding
Industrial • Statewide permit available, but individual permit may be required under certain circumstances • e.g., Sensitive water body • Industry-specific permits possible (unique or common problem) • e.g. hydrocarbons from auto dismantlers • File NOI • SWPPP required
Applicable Facilities • Any facility where “industrial” materials are exposed to stormwater • Manufacturing facilities • Steam power generation • Resource extraction (mining) • Hazardous waste storage and handling • Landfill and recycling facilities • Transportation maintenance yards
Example BMPs: Covered Storage Temporary covers difficult to use Better
BMPs: Secondary Containment Note: Uncovered containment will fill with stormwater Better
Municipal Separate Storm Sewer System (MS4) • Phase I: populations greater than 100,000 • Phase II: just about everyone else, some discretion with the Regional Boards • Storm Water Management Plan (SWMP) required
Minimum SWMP Programs • Public Education and Outreach • Public Involvement and Participation • Illicit Discharge Detection and Elimination • Good Housekeeping and Source Control for Municipal Operations (e.g. street sweeping) • Construction Program Management… • Post-Construction Stormwater Management…
Post Construction BMPs Detention Basin
Post Construction BMPs Filter Sedimentation Sand filter
Post Construction BMPs Biofiltration strip and Infiltration Trench
What is good enough? • Stormwater usually has no directly enforced numeric standards • Different from wastewater regulation • Federal Clean Water Act says “shall require controls to reduce the discharge of pollutants to themaximumextentpracticable….”
Implement Program Revise SWMP according to success or failure Evaluate Success Develop Performance Standards (in SWMP) Iterative Approach
What MEP isn’t … • Infeasible technology • Technology where costs greatly outweighs pollution control benefits • Technology whose implementation would violate legal and institutional constraints (from various court cases)
When MEP isn’t good enough … • Most permits have language that prohibits the discharge of stormwater that “causes or contributes to exceedances of water quality objectives” • Standards to protect beneficial uses
So what happens to violators? • Recent examples: • 6 days in jail and $1,000 fine for an excavator that didn’t have a permit to work near a creek near Sebastopol. Property owner must restore the site. • Six L.A. auto dismantlers face criminal charges for not having SWPPPs.
Who does this affect? • Civil engineers doing … • Public works • Transportation • Site development • Modifications to existing infrastructure