1 / 1

Beam losses at injection (288b injection, new BLM checks, ...)

Beam losses at injection (288b injection, new BLM checks, ...) Would like to include this in 1 st block - operationally important

medge-moore
Download Presentation

Beam losses at injection (288b injection, new BLM checks, ...)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam losses at injection (288b injection, new BLM checks, ...) • Would like to include this in 1st block - operationally important • Protection from long devices (TCDQ/TCTchecks). Combined with Collimation studies on asynchronous dump during beam based setup at 450 GeV + end of fill studies during aperture measurements with squeezed optics (LIBD, Collimation) • Probably later (depends on COLL priorities) • Impedance of TCDQ and TDIs (bunch length dependence), beam induced heating at these elements and MKI. some parasitic studies possible for beam induced heating (Impedance, RF, LIBD) • Later in the year • Quench limits: workshop on sc magnets and beam induced quenches in autumn (MP, QPS, LIBD, BLM). Injection(higher injected intensity, bumps?). With Wirescanner • Later in the year • Injection matching and emittance preservation (matching screens installed?) (BI, LIBD..) • Matching monitor gave some results but some preparation needed - can be done later • Q20 optics beam extraction, transfer and injection: could be done during downtime (SPS-LIU, LIBD,RF) • Aim for 2nd MD block - can prepare in SPS and to TL TEDs parasitically • Transfer line stability  during commissioning + some time needed later this year (parasitic measurements possible) • In progress and some data from commissioning taken - can be done parasitically when LHC down - would like 4h in 1st MD block for sensitivity checks but not highest priority • UFOs at MKIs and MKQ (Tobias) • Tobias

More Related