Learning & teaching refurbishments 2012. October 2012. Medical School Pool cluster MG130 . After. Befor e. Medical School MG130 Pool Cluster .
E N D
Learning & teaching refurbishments 2012 October 2012
Medical School Pool cluster MG130 After Before
Medical School MG130 Pool Cluster The corridor was removed to create a larger room and increase the PC’s from 55 to 70. The teaching position was moved to the centre of the room with repeater screens along the wall.
Bedson Chart Cluster 3.30 Increased from 35 to 42 PC stations The insulated ceiling improves the heating and lighting. After Before
Bedson Chart Cluster 3.30 The focal teaching wall was moved to improve student sight lines.
Bedson 2.40 creation of new cluster Close to other teaching spaces in the Bedson enhancing this teaching hub
Bedson 2.40PC Capacity 40 The ‘daisy’ desks were used to ease movement around the room
Ridley 1 Nereid Cluster 4.72 After Before Increased from 24 to 30 PC work stations. Posters to go up on the walls.
Daysh 1.31 Brae Cluster A central teaching position was created and access around the room improved with alterations to the layout. After Before
Daysh 1.31 Brae Cluster New glazed entrance with quick access stations to provide additional space at class change over times
Agriculture building student social space ground floor Student social space with 9 PC’s, collaborative working table and soft seating. Former SAgE faculty meeting room
KGVI building student social space basement B56 & B57 Opened up with B57 to provide a larger space. Existing common room March 2012
KGVI building student social space The additional space provides an area for students to eat and drink.
Ridley 1 ground floor student common room Students requested a number of minor improvements to the space which included a zip hot water boiler and sink …. …. and the furniture recycling mail base brought in coffee tables, alternative seating and a table football.
Bedson building porters lodge Student touch down space created with quick access stations and soft seating. Notice boards are being installed soon. Old porters lodge removed
CLT first floor corridor This project to improve the student corridor and access and egress to the lecture theatre and teaching rooms is still on going and will complete in November. After Before A student touch down space will be created and notice boards will be added for student information.
CLT first floor corridor This area of seminar rooms always looked abandoned, the refurbishment ties them in with the main corridor and ground floor refurbishment After Before
Ridley 1 MAST Project Lab 5.76 After Before An old research lab in the Ridley building has been refurbished to provide space for student projects.