An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next European Dipole (NED) Overview & Status Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE Governing Board Meeting CERN 25 November 2005

  2. Schedule (1/4)

  3. Schedule (2/4)

  4. Schedule (3/4)

  5. Schedule (4/4) • A 3-month delay might be foreseen (mainly due to delay on hiring of two posdocs at CEA).

  6. Schedule (4/4)

  7. Budget • Since the launching of NED, CIEMAT (Spain) has joined the collaboration (and we foresee to organize our Spring Steering Committee meeting on their premises). • Could we get some “symbolic” travel money (3000 euros) for them?.

  8. Perspectives • At present, the funding provided by CARE does not cover the detailed design, manufacturing and test of the 15-T (conductor peakfield) dipole magnet model that was included in the initial NED proposal • (~22 staff.year, material costs: ~1.2 M€). • As a result of CARE/HHH activities, there are now clear recommendations from the CERN accelerator physics community (see J.P. Koutchouk’s highlight talk and F. Ruggiero’s talk in the AMT session) to strengthen Nb3Sn magnet R&D efforts in Europe and complement the ongoing US-LHC Accelerator Research Program in a time frame compatible with LHC luminosity. • It is now up to the managements of the NED collaborators and to ESGARD to establish a strategy on how to cope with the NED funding issue.