1 / 10

Importance of using multiple methodologies in production forecasting

Production forecast plays a very important role in the global oil and gas industry to provide growth and ensure continuity in the exploration and production business. Investors usually expect a high rate of delivery so to improve this record, there is a need to provide the best possible range of production forecasts methodologies for better production rate. <br><br>visit us: http://meerasimulation.com/

Download Presentation

Importance of using multiple methodologies in production forecasting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Importance Of Using Multiple Methodologies In Production Forecasting

  2. Production forecast plays a very important role in the global oil and gas industry to provide growth and ensure continuity in the exploration and production business. Investors usually expect a high rate of delivery so to improve this record, there is a need to provide the best possible range of production forecasts methodologies for better production rate. 

  3. Different long term Forecasting methodologies The importance of providing realistic long-term forecasts cannot be underestimated because it effectively drives operational strategies to shareholders. There exists the possibility of combining different production forecasting methods to validate the solution to the problem statement. All methods inevitably have their advantages when used alone, but the limitations of individual methods can affect the validity of results.

  4. Numerical simulation This method  as reservoir simulation requires a history match to calibrate inputs. 

  5. The history-matching process  This methodology can be tedious and time-consuming, and it requires expertise and good judgment. Other limitations include applying proper mathematical theories and managing the non-uniqueness of solutions contributed by differing geological interpretations. The validity of reservoir simulation results can be questioned because of different issues.

  6. Analogs This methodology  can be useful in predicting the future performance of new wells based on the performance of existing type wells. However, a big challenge to analog-based forecasting is the inability to focus on reservoir deliver ability and quantify the impact of variations in geology, semi-optimum well design, and unforeseen operational difficulties on production.

  7. Analytical Models This can be used based on the simplicity of the models. A big drawback is in incorporating heterogeneities into an analytical model. 

  8. Inflow performance relationship (IPR) curves IPR curves represent the easiest method that requires a limited set of user input parameters, and they also produce single-point solutions. Material balance methods are easy and quick methods that honor material balance equations. Looking at other production technologies such as steam-assisted gravity drainage in thermal reservoirs, IPR methods may be used for pump optimization and design tasks but significantly misrepresent the production based on changing dynamic reservoir simulation.

  9. Conclusion Production forecasts can be improved through multiple methodologies that can be used to ultimately narrow down the variability and ultimately converge to some solution. There are various examples in which a combination of methods has been used to narrow down uncertainty in predictions and ultimately contribute to a more practical and perfect set of production forecasts.

  10. This Presentation brought to you by Meera Simulation – A first hybrid 3d reservoir simulatorhttp://meerasimulation.com/

More Related