860 likes | 877 Views
79th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks. July 15-21, 2012 Grand Hyatt Manchester, San Diego, California, USA Closing Report. 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting.
E N D
79th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks July 15-21, 2012 Grand Hyatt Manchester, San Diego, California, USA Closing Report Robert F. Heile, ZigBee Alliance
802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 Study Groups/Interest Groups New Projects (WNG), Interpretations, Rules Pat Kinney, Kinney Consulting Study Groups: 15.4 Ultra Low Power (ULP) Chair: Shahriar Emami, Samsung Interest Groups Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Visible Light Comm follow-on (LED) Chair: Yeong Min Jang Kookmin University Layer 2 Routing (L2R) Chair: Clint Powell Task Groups TG8 Peer Aware Communcations Miung Lee, CUNY Chair TG4j MBAN 15.4 PHY Ray Krasinski, Philips Chair TG4k Low Energy Critical Infrastructure Pat Kinney, Kinney Consulting Chair TG9 Key Management Protocol Robert Moskowitz, Verizon Chair TG4m 15.4 TV White Space PHY Sangsung Choi, ETRI Chair TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio Chair TG4p 15.4 Positive Train Control (PTC) Chair: Jon Adams, Lilee Systems Chair 802.15 Organization Chart Robert F. Heile, ZigBee Alliance
San Diego Session ObjectivesJuly 15-21, 2012 TASK GROUP-4j MBAN PHY Amendment • Comment Resolution • Update Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring • Final first draft for Letter Ballot • Update Project Plan/Timeline TASK GROUP-4m : TVWS PHY for 15.4 (4TV) • Review responses to CFP • Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance
San Diego Session ObjectivesJuly 15-21, 2012 TASK GROUP4n –China MBAN • Review response to the CFA • Update Project Plan/Timeline TASK GROUP-4p Positive Train Control • Review preliminary technical proposals • Update Project Plan/Timeline TASK GROUP-8 Smart Utility Networks • Work on Application Matrix and Technical Guidance Document • Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance
San Diego Session ObjectivesJuly 15-21, 2012 • TASK GROUP 9 –Key Management Protocol: • Work on draft • Update Project Plan/Timeline • Study Group: 15.4 Ultra Low Power Amendment • Work draft PAR on 5C- target for Nov • Spectrum Resource Use (SRU) Interest Group: • Hear Contributions • Discuss future of the Committee Robert F. Heile, ZigBee Alliance
San Diego Session ObjectivesJuly 15-21, 2012 • THz Interest Group: • Hear Contributions • Discuss future of the Committee • Visible Light Comm follow-on(LED) Interest Group: • Hear Contributions • Discuss future of the Committee • Layer 2 Routing (L2R) Interest Group: • Hear Contributions • Discuss future of the Committee Robert F. Heile, ZigBee Alliance
San Diego Session ObjectivesJuly 15-21, 2012 NEW PROJECTS SUBCOMMITTEE • Report on WNG progress • Hear new presentations Robert F. Heile, ZigBee Alliance
San Diego Session Results Robert F. Heile, ZigBee Alliance
IEEE 802.15.4j Task GroupMedical Body Area NetworksRay Krasinski, PhilipsChair Closing Report 10th Meeting of the MBAN Task Group San Diego, CA July 15-20, 2012 Raymond Krasinski, Philips
Scope of MBAN Task Group • Draft an amendment of 802.15.4 for MBAN • This amendment defines a physical layer for IEEE 802.15.4 in the 2360 to 2400 MHz band which complies with Federal Communications Commission (FCC) MBAN rules. This amendment defines modifications to the MAC needed to support this new physical layer. Raymond Krasinski, Philips
Accomplishments for July Meeting • Resolved all remaining comments received in response to Letter Ballot • Discussion with IEEE 11073 • Participation by TG4n and 802.15.6 members • TG vote to ask WG to start Recirculation • And form BRC Raymond Krasinski, Philips
TG4J motion 1 Approve the resolution of all comments of: 15-12-0218-13-004j-lb81-comment-register related to Subclause 5 and Subclause 6 as resolving comments on d1P802-15-4j_Draft_Standard. Moved: Dave Evans Second: Paul Chilton Vote: Approved by Unanimous Consent Raymond Krasinski, Philips
TG4J motion 2 That 802.15.4j Task Group approves d2802-15-4j_Draft_Standard.pdf and requests that 802.15 WG recirculate d2802-15-4j_Draft_Standard.pdf. Moved: Dave Evans Second: Liang Li Vote: Approved by Unanimous Consent Raymond Krasinski, Philips
TG4J motion 3 Move that the 802.15.4j Task Group seek 802.15 WG approval of the formation of a Ballot Resolution Committee for the Recirculation Letter Ballot of d2P802-15-4j_Draft_Standard. The committee will be chaired by Ray Krasinski. Moved: Dave Evans Second: Art Astrin Vote: Approved by Unanimous Consent Raymond Krasinski, Philips
WG motion 1 Move that the WG approve the start of a recirculation ballot to forward the d2802-15-4j_Draft_Standard.pdf to Sponsor Ballot. Moved: Liang Li Second: Ray Krasinski Vote: Raymond Krasinski, Philips
WG motion 2 Move to authorize Raymond Krasinski, David Evans, Shannon Park, Suhwook Kim, James Gilb, and Paul Chilton as the 802.15.4j Ballot Resolution Committee chaired by Raymond Krasinski; said committee to expire at the beginning of the September 2012 802.15 Wireless Interim Session. The Ballot Resolution Committee is authorized to approve the resolutions to comments received from recirculation of the 15.4j draft and to approve the start of another recirculation of the 15.4j draft on behalf of the Working Group. Comment resolution on Recirculations between sessions will be conducted via reflector email and via teleconferences announced to the reflector at least 7 days in advance. Moved: Dave Evans Second: Art Astrin Vote: Raymond Krasinski, Philips
TG4J Schedule • Proposal Effort • Call for Proposals Mar 2011 • Preliminary Proposals May 2011 • Final Proposals July 2011 • Begin Draft Amendment Nov 2011 • Drafting • Preliminary draft Amendment Jan 2012 • Balloting • Letter ballot Mar 2012 • Comment Resolution May 2012 • Recirculation I (& 2) Jul 2012 • Sponsor Ballot Sep 2012 Raymond Krasinski, Philips
Plan for Sept Meeting • Resolve all comments received in response to recirculation of Letter Ballot • Move to Sponsor Ballot Raymond Krasinski, Philips
IEEE 802.15.4k Task GroupLow Energy Critical Infrastructure MonitoringPat Kinney, Kinney ConsultingChair Closing Report San Diego, CA July 15-20, 2012 Pat Kinney, Kinney Consulting
TG4k PAR Scope of Proposed Standard This standard is an amendment to IEEE 802.15.4. It addresses principally those applications such as critical infrastructure monitoring. It defines an alternate PHY and only those MAC modifications needed to support its implementation. The amendment supports: Operation in any of the regionally available licensed, license exempt, and special purpose frequency bands. Simultaneous operation for at least 8 co-located orthogonal networks Application data rate of less than 40 kbits per second Propagation path loss of at least 120 dB > 1000 endpoints per mains powered infrastructure Asymmetric application data flow Extreme difference in capabilities and performance between endpoint devices and coordinating devices (collectors) Coordinator may support all standardized modulations (MCS) and data rates Coordinator may be required to support antenna diversity or antenna beam steering End point must be able to conserve energy Reliable operation in dramatically changing environments (no control over environment). This amendment also provides mechanisms that enable coexistence with other systems in the same band(s) including IEEE 802.11, 802.15, and 802.16 systems Slide 21 <Pat Kinney>, <Kinney Consulting LLC>
Purpose of Proposed Standard The purpose of this amendment is to facilitate point to multi-thousands of points communications for critical infrastructure monitoring devices. The amendment addresses the application’s user needs of minimal network infrastructure, and enables the collection of scheduled and event data from a large number of non-mains powered end points that are widely dispersed, or are in challenging propagation environments. To facilitate low energy operation necessary for multi-year battery life, the amendment minimizes network maintenance traffic and device wake durations. In addition, the amendment addresses the changing propagation and interference environments. Slide 22 <Pat Kinney>, <Kinney Consulting LLC>
Meeting Goals (Agenda 15-12-309-01) • Review preliminary draft document15-12-0089-06 • Review and resolve comments from preliminary draft review • Review coexistence document • Resolve comments from coexistence review • Joint meeting with 802.19 Coexistence • Motion to approve preliminary draft, edited as per comment resolution document, as 802.15.4k draft • Motion to request 802.15 WG to ballot 802.15.4k draft Slide 23 <Pat Kinney>, <Kinney Consulting LLC>
Overview of 437 Comments (15-12-348-07) • Clause 3 1 • Clause 4 31 • Clause 5 200 • Clause 6 71 • Clause 8 20 • Clause 9 13 • Clause 19 83 • Annex D 3 • Annex P 15 <Pat Kinney>, <Kinney Consulting LLC>
TG4k Schedule • Proposal Effort • Final Proposals Sep 2011 • Adopt Baseline Nov 2011 • Drafting • Circulate preliminary document for comments May 2012 • Final draft editing (ready for WG Letter Ballot) July 2012 • Ballot Comment Resolution • Letter ballot comment resolution Sep/Nov 2012 • Recirculation I comment resolution Jan 2013 • Recirculation II comment resolution Mar 2013 • Recirculation III comment resolution May 2013 • Sponsor Ballot (release draft for ballot) July 2013 • SB Recirculation I comment resolution Sep 2013 • SB Recirculation II comment resolution Nov 2013 <Pat Kinney>, <Kinney Consulting LLC>
TG4k Motions • TG4k approves the resolutions contained in document 15-12-0348-07 and empowers the technical editor to modify 15-12-0089-06 as per the resolutions, posting the modified document as d1P802-15-4k_Draft_Standard, to the members only site. • TG4k requests that the 802.15 WG approve d1P802-15-4k_Draft_Standard for Letter Ballot upon completion of edits <Pat Kinney>, <Kinney Consulting LLC>
TG4m 4TV Closing Report for July 2012 Sangsung Choi, Chair (ETRI) Sangsung Choi(ETRI)
Meeting Goal This Week Hear final proposal presentations Hear technical presentations if any Discuss merging process Discuss timeline and next steps
Meeting Slots Sangsung Choi(ETRI)
TG4m Closing Report(1) • Heard 8 final proposals - 4 PHY & 4 MAC Proposals
TG4m Closing Report(2) • Heard 2 Presentations - The Usage of Polarized Antenna System(Kyunghee Chang/Inha University) - Discussion to facilitate expediting the selection of the PHY specification in TG4m(Daniel Popa/ITRON) • Discuss Merging Process - 3 Sub-Groups: FSK PHY, OFDM PHY, NB-OFDM PHY, MAC - Merge proposals before Sep. meeting - Present & discuss merged proposals, and agree baseline during Sep. meeting
Future Plan/Timeline(1) • Form a New Task Group • - Affirm new officers for TG4m September ,2011 • - Prepare TGD November, 2011 • - Completed TGD March, 2012 • Proposal Effort • - Call for Preliminary Proposals May, 7 2012 • - Present Preliminary Proposal May, 2012 • - Call for Final Proposals July 9, 2012 • - Present Final Proposals July , 2012 • - Present & Discuss merging proposals September, 2012 • - Adopt Baseline September, 2012 Sangsung Choi(ETRI)
Future Plan/Timeline(2) • Drafting • - Editors create first draft November 2012 • - Discuss & edit draft January 2013, March 2013 • - Final draft (ready for WG Letter Ballot) May 2013 • Balloting • - Letter ballot July 2013 • - Recirculation September, November 2013, January 2014 • - Sponsor ballot March 2014 Sangsung Choi(ETRI)
IEEE 802.15 TG4n Chinese Medical Band Art Astrin, Chair Astrin Radio Closing Report 2st Meeting as a Task Group 4n San Diego, CA July 19, 2012
Since May meeting • Issued First Call for Applications
Meeting Accomplishments • Heard 6 Presentations • Had discussions about the Chinese medical bands • Reviewed IEEE 11073 • Reviewed and updated the TG4n web page
Contributions 15-12-0307-01-004n-Interferences-on-frequency-bands-of-IEEE802-15-4n 15-12-0310-00-004n-wban-based-micro-electronic-neural-bridge 15-12-0316-01-004n-Complex-EM- Environment-in-Chinese-Hospitals 15-12-0339-00-004n-Human-Physiological-Parameter-Monitoring 15-12-0342-00-004n-cwpan-cban-actives-in-2012 15-12-0394-00-004n-overview-of-i2r-s-wireless-transceiver-design-for-mban-activities
Next Steps Will issue Second Call for Applications: 15-12-0269-03-004n-call-for-applications
PAR and 5C • PAR: 15-12-0215-00-004n-PAR Approved March 2012 • 5C: 15-12-0007-05-004n-Chinese-MBAN-Body-Area-Network-5C
Thank You ! • Any Questions ?
IEEE 802.15.4p Positive Train Control Task Group Closing Report 19 July 2012 Jon Adams, Chair Lilee Systems Ltd. Jon Adams, Lilee Systems
90 Participants from 60+ Entities • CalAmp • Rail Safety Consulting • Institute for Infocomm Research • National Taiwan University • Qualcomm • Freescale • Kyocera • Interdigital • Tensorcom • Analog Devices • CSX • National Technical Systems • Parsons Brinckerhoff • Stantec • Bombardier Transportation • Rohde and Schwarz • Korea Railroad Research Institute • Lilee Systems • Parsons • The Boeing Company • Vinnotech • Yokogawa • Sony • Herzog • TI • GuardRFID • Inha University • OneAccess Networks • Meiji University • ARINC • Siemens • US DOT • Sunrise Micro • US DOT FTA • Samsung Information Systems America • The Ohio State University • Electronics and Telecommunications Research Institute • US DOT Volpe • Safetran (Invensys Rail) • Union Pacific RR • LG Electronics • Notor Research • Semtech • Noblis • Tohoku University REIC • Beijing Univ of Posts and Telecommunications • NXP • Verizon • Authentec • Sensus • TU Braunschweig • Via Technologies • Halcrow • US DOT FRA • Philips • Astrin Radio • China Academy of Telecomm Research • Gannett Fleming • GE • APTA • Semaphore Group • Anritsu • Oki Jon Adams, Lilee Systems
About Positive Train Control • Positive Train Control systems designed to prevent: • Train-to-train collisions • Overspeed derailments • Unauthorized incursions into work zones • Movement through improperly configured track switch • PTC systems are designed to mitigate error by human operators • Comprised of four subsystems • Locomotive segment • Wayside segment • Back office segment • Communications segment • IEEE 802.15.4p • Adds vehicular mobility to 802.15.4 • Initial application is interoperable communications between • Train and Wayside • Train and Network Infrastructure • Wayside and Network Infrastructure Office Communications Segment Locomotive Wayside Jon Adams, Lilee Systems
Meeting Highlights • Presentations • 15-12-0407, Security Device Identities for transit • 15-12-0406, Use of DSRC band for PTC • 15-12-0414, Preliminary Technical Proposal for PTC • Joint Meeting with 802.18 to discuss DSRC band regulatory considerations • Special guests • Mr. Louis Sanders, Technical Director of the American Public Transportation Association (APTA) • Mr. Satoshi (Sam) Oyama, Senior Researcher in Intelligent Transportation Systems, ARIB Jon Adams, Lilee Systems
15.4p Meeting Objectives • 6 Time Slots • Discuss technical proposal process and the Technical Guidance Document (802.15-12-0267-01) • Preliminary technical presentations • Informative presentations • Continue to flesh out schedule moving toward completed standard Jon Adams, Lilee Systems
IEEE 802.15.4p PTC Schedule Study Group • Approval of Study Group Nov 2011 • Completion of PAR/5C Docs Jan 2012 • Approval of PAR/5C Docs Jan 2012 • Preparation for Task Group Phase • Call for Applications Dec 2011 • Extension of Call for Applications Mar 2012 • Approval by NESCOM and 802 EC of IEEE802.15.4p TG Apr 2012 Task Group • Proposal Effort • Technical Guidance Document May 2012 • Call for Proposals May 2012 • Preliminary Proposals July 2012 • Final Proposals Sep 2012 • Adopt Baseline Nov 2012 • Drafting • Preliminary specification draft Jan 2013 • Final draft (ready for WG Letter Ballot) Mar 2013 Jon Adams, Lilee Systems
PAC Closing ReportMyung Lee, ChairCUNY July 19, 2012 Myung Lee, CUNY
Meeting Objectives • Presentations on application and use cases • Development of Applications Matrix • Development of Technical Guidance Document (TGD) • Project Plan Myung Lee, CUNY
Achievements • 7 time slots at this meeting • 10 Presentations on Application Matrix & Technical Guidance Document (TGD) • Jong Taek Oh (Hansung U): Doc. 15-12-0313r0 • Eldad Zeira (InterDigital): Doc. 15-12-0346r0 • Marco Hernandez (NICT): Doc. 15-12-0379r0 • Robert Moskowitz (Verizon): Doc. 15-12-0388r0 • Marco Hernandez (NICT): Doc. 15-12-0365r0 • Eldad Zeira (InterDigital): Doc. 15-12-0345r0 (TGD) • Igor Dotlic (NICT) : Doc. 15-12-0408 • Seunggeun Jin (ETRI): Doc. 350r2 (Application matrix) • Byung-Jae Kwak (ETRI): Doc. 411r0 • Seunghoon Park (Samsung): Doc. 385r1 (TGD) • Drafted First versions of Application Matrix (AM) and Technical Guidance Document (TGD) • TG8 Web page established Myung Lee, CUNY