Environmental & Ecological Economics for Development

Environmental & Ecological Economics for Development. Lecture 2: Valuation of the Environment. Outline. Economic values for the environment Contingent Valuation (CVM) Hedonic Pricing (HP) Travel Cost Method (TCM) Production Function Approach (PFA). 1. Values for the environment.

megara
Download Presentation

Environmental & Ecological Economics for Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental & Ecological Economics for Development Lecture 2: Valuation of the Environment

  2. Outline • Economic values for the environment • Contingent Valuation (CVM) • Hedonic Pricing (HP) • Travel Cost Method (TCM) • Production Function Approach (PFA)

  3. 1. Values for the environment • Pricing/charging of un-priced environmental goods & services • Valuing environmental impacts in cost-benefit analysis • Controversial basis of methods • Subject to lobbying and manipulation

  4. Demand curves – substitution and income effects Price of X2 rises from Px21 to Px21 leading to a fall in consumption of X2 which can be decomposed into a substitution and an income effect. Welfare evaluation requires that we remove the income effect so that we arrive at a “compensated” demand curve

  5. Economic valuation - demand and consumer surplus

  6. Categories of Goods

  7. Demand for private & public goods

  8. Economic valuation methods

  9. 1. Economic value of the environment • Use values: direct use of environmental resources • e.g., fertility of soil, fish from the sea, timber from forest, water from stream, etc. • Option values: the value people place on future ability to use environment; the willingness to preserve the environment even if one is not currently using it • future use by descendants or by others – altruism • Existence values:willingness to pay for preserving or improving resources that people will never use; unrelated to any actual or potential use • existence of environment, even without human beings, is intrinsically important • non-human rights

  10. 1. Economic value of the environment (cont) Four categories of environmental services –use and option values (e.g., forest) • Input for production: timber, honey, medicinal plants • Waste sink: absorbs CO2, dumping area • Amenity service: recreation • Life-support service: soil cover, plants & animals, rainfall

  11. 1.Economic value of the environment (cont) • Non-use/existence value: willingness to pay for preserving or improving resources that people will never use; unrelated to any actual or potential use • existence of environment, even without human beings, is intrinsically important • non-humans rights

  12. 1. Economic value of the environment (cont’d) • Direct & indirect approaches to measure values • Direct: asking individuals questions about the value of environmental services; captures both use and non-use values; e.g., CVM • Indirect: estimates from the observed behaviour of individuals in relation to marketed commodities; to estimate only use-values, e.g., HP, TCM, PFA

  13. 2. Contingent Valuation Method (CVM) Directly asking people about their • willingness-to-pay (WTP) for availability of an environment service and/or • willingness-to-accept (WTA) compensation for loss of an environmental service

  14. 2. Contingent Valuation Method (CVM) (cont) • Six stages in CVM • Set-up a hypothetical ‘market’ • Obtain bids • Estimate mean WTP or WTA • Estimate bid curves • Aggregate data • Evaluate the CVM exercise Use preserving a community forest as example

  15. 2. Contingent Valuation Method (CVM) (cont) • Set-up a hypothetical market • Create a reason for payment • “the forest cannot be preserved without the management by the forestry department which entails costs” • How are funds to be raised • Income taxes? Property tax? Fees? Contributions? User fees? etc.

  16. 2. Contingent Valuation Method (CVM) (cont) • Obtain bids • Survey instrument administered asking individuals to state their maximum WTP or minimum WTA

  17. 2. Contingent Valuation Method (CVM) (cont) • The bids can be obtained through • Bidding game: higher and higher amounts suggested • Close-ended referendum: yes/no reply to a single payment • Payment card: a range of values on a card • Open-ended question: no value suggested

  18. 2. Contingent Valuation Method (CVM) (cont) • Estimate mean WTP or WTA • Mean/median of the bids are calculated • Protest bids: zero bids for reasons other than attaching zero value; e.g., refuse to attach any value, non-response • Outliers: median preferred if there are ‘problematic’ outliers

  19. 2. Contingent Valuation Method (CVM) (cont) • Estimate bid curves • How are the bids related to the individual characteristics of respondents? WTPi or WTAi = f(Ii, Ei, Ai, Qi, O) Ii = income; Ei = education; Ai = age; Qi = size of forest; O = other relevant factors

  20. 2. Contingent Valuation Method (CVM) (cont) • Estimation of bid curve helps to address issues like, • Do richer people value the forest more than the poor? • Do educated people value the forest more than the uneducated? • Do older people value the forest more than the younger? • How sensitive are people to the stock of forest?

  21. 2. Contingent Valuation Method (CVM) (cont) • Aggregate data • The bid value from the sample has to be scaled-up to the relevant population • Corrections for sampling biases – as in other studies – may be required • If the bids are related to different periods of time  discounting

  22. 2. Contingent Valuation Method (CVM) (cont) • Evaluate the CVM exercise • May include sensitivity analysis • Proportions of protest bids • Understanding of hypothetical ‘market’ by respondents • Comparing with results from other studies • etc.

  23. 2. Contingent Valuation Method (CVM) (cont) • Some problems in CVM • Strategic bias: respondents may over- or under-state bids to influence possible outcomes • over-state: if respondents think others may provide the resources (NIMBYs) • under-state: if respondents think they are going to provide the resources (the free rider problem)

  24. 2. Contingent Valuation Method (CVM) (cont) • Design bias: the design of the survey may bias respondents’ bids • Choice of bid vehicle: bidding game, close-ended referendum, open ended questions, etc. may give different results • Nature of hypothetical ‘market’: income taxes? property taxes? fees? etc. • Starting point bias: the starting point of the bid may influence the final choice of respondents

  25. 2. Contingent Valuation Method (CVM) (cont’d) • Mental account bias: • respondents may systematically over-state WTP by thinking about a broader problem than the specific environmental problem • respondent may report the “total WTP for preserving all forests” rather than the specific forest

  26. 2. Contingent Valuation Method (CVM) (cont) • Hypothetical market error: do people act the same way in a hypothetical ‘market’ as they do in a real one? • Responsibility considerations: should polluters pay for preserving the environment?

  27. 2. Contingent Valuation Method (CVM) (cont) Some empirical applications • Social forestry in Orissa, India (Kohlin, 2001a) • community forests more beneficial to people living far from forests and those depending on market purchase a. Kohlin, Gunnar. "Contingent Valuation in Project Planning and Evaluation: The Case of Social Forestry in Orissa, India." Environment and Development Economics, 2001, 6(2), pp. 237-58.

  28. 2. Contingent Valuation Method (CVM) (cont) • Wetland in Taiwan (Hammitt, et al., 2001) • estimated households’ WTP to preserve Kuantu wetland • Community forestry in Ethiopia (Mekonnen, 2000) • household size & income, distance, number of trees owned and sex of head significant Hammitt, James K.; Liu, Jin-Tan and Liu, Jin-Long. "Contingent Valuation of a Taiwanese Wetland." Environment and Development Economics, 2001, 6(2), pp. 259-68. Mekonnen, Alemu. "Valuation of Community Forestry in Ethiopia: A Contingent Valuation Study of Rural Households." Environment and Development Economics, 2000, 5(3), pp. 289-308.

  29. 3. Hedonic Pricing (HP) • HP identifies the value of an environmental service by examining how market value of a good (e.g., a house) is affected by environmental damage (e.g., pollution) • How much lower would the price of a house be in a polluted neighbourhood as compared to a similar house in a non-polluted neighbourhood?

  30. 3. Hedonic Pricing (HP) (cont’d) • Estimation of hedonic price function Ph = f(Si, Nj, Ak, Qm) Ph = house price Si = site/property characteristics (rooms, garage, garden, etc.) Nj = neighbourhood characteristics Ak = accessibility (link with other neighbourhoods) Qm= environmental quality

  31. 3. Hedonic Pricing (HP) (cont) • The HP function tells us by how much property price changes for a change in environmental quality – captures WTP • Typically as environmental quality improves, property prices rise but at diminishing rate • Problems in HP: econometric problems, market segmentation (ethnic composition, owner vs. rental), etc.

  32. Pi = f (Qi) House prices, Pi Environmental quality, Qi

  33. 4. Travel Cost Method (TCM) • The cost of using the environmental service as proxy for value of environment • Mainly used in outdoor recreation, fishing, hunting, boating, national park • Travel cost for individual i to site j, Cij Cij = DCij + TCij + Fj, i=1, …, n; j =1, …, m DCij = distance costs TCij= time costs (opportunity cost of labour) Fj = entrance fee

  34. 4. Travel Cost Method (TCM) (cont) • Trip generating function (TGF): predicts how many visits, Vij, by individual i to site j given travel cost and socio-economic characteristics Vij = f(Cij, Ii, Ei, Ai, etc.) Ii = income Ei = education Ai = age • The TGF gives a demand curve for changes in travel cost – WTP for the service

  35. Costs per visit, C C* C1 C2 Vmax V1 V2 No. of visits, Vj

  36. 4. Travel Cost Method (TCM) (cont) • Maximum number of visits when travel cost (fee) is 0 • At C2 & C1, V2 & V1 number of visits – individual still interested to visit (there is WTP for the service); s/he willing to pay as high as C* • Travel costs/fee capture the amounts people are willing to pay (consumer surplus) to visit the environmental service = the value of the environmental service

  37. 4. Travel Cost Method (TCM) (cont) Some problems with TCM: • Multi-purpose trips • Calculating • distance costs (e.g., only petrol, depreciation, etc.) • the value of time (what is the opportunity cost of time for visiting the environmental service?) is complicated • Econometric problems

  38. 5. Production Function Approach (PFA) • Examines how environmental quality affects firm or household production • How much marketed inputs are required to compensate for environmental degradation so that the same level of output is produced?

  39. 5. Production Function Approach (PFA) (cont) • Production function: Qi = f(L, K, I, E) Qi = quantity of output L = labour K = capital I = other inputs E = environmental quality • What are the additional costs in L, K and I if E deteriorates?

  40. 5. Production Function Approach (PFA) (cont) • E.g., fish catch declining with pollution of water • How much more labour, capital (e.g., fishing boats) and other inputs are required to get the same catch as before the pollution? • The additional costs incurred for the additional labour, capital and other inputs measure the value of the water pollution