National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Investor Presentation Nov 2010
SPECTRUM OF OPERATIONS Bauxite Mine Panchpatimali Alumina Refinery Damanjodi
Spectrum of Operations Aluminium Smelter Angul Thermal Power Plant Angul Port facility Vizag
FINANCIALS ( FY10 & PREVIOUS FIVE YEARS) Figures in Rs. Crore 1 Crore=10 Million Sales LME PAT EPS
FINANCIALS ( FY11) Figures in Rs. Crore 1 Crore=10 Million NET SALES PAT EPS 40 % 125 % 125 % QoQ COMPARISON
FINANCIALS (FY11) QoQ COMPARISON Figures in Rs. Crore 1 Crore=10 Million NET SALES PAT EPS 27 % 40 % 40 %
PRODUCTION CAPACITIES POST 2ND PHASE CURRENT STATUS SCHEDULE JAN’11 BAUXITE MINES SCHEDULE JAN’11 ALUMINA REFINERY ALUMINIUM SMELTER COMPLETED MAR’10 COMPLETED JUL’10 CAPTIVE POWER
FINANCIAL PROJECTIONS – NEXT FOUR YEARS GROSS SALES SALES LME PAT Exchange: 1 USD = Rs. 46
TO BE A REPUTED GLOBAL COMPANY IN THE METALS AND ENERGY SECTORS
EXPANSION OF REFINERY • 5TH STREAM OF 7 LAKH MT FROM YEAR 2014 • (TOTAL CAPACITY – 30 LAKH MT) • INVESTMENT – Rs 1800 CRORE • BAUXITE NEED OF REFINERY AVAILABLE • SPECIALITY GRADE ALUMINA PLANNNED BAUXITE NEED OF REFINERY MILLION TONNES
BAUXITE RESERVES FIGURES IN MILLION TONNES REQUIREMENT TILL YEAR 2040 - 260 MILLION TONNES
UPGRADATION OF SMLETER TO 220 KA AT ANGUL CAPACITY ADDITION: 92,000 TPY 1 x 120 MW UNIT IN CPP INVESTMENT: Rs 900 CRORE (POT LINES AND CARBON PLANT) Rs 600 CRORE (POWER) EXPANSION OF SMELTER & CPP
PLAN: UP-GRADATION OF SMELTER AMPERAGE TO 220 KA GAIN IN PRODUCTION: 92,000 TPY UP-GRADATION TO BE COMPLETED GRADUALLY BY 2016 STATUS: RIO-TINTO ALCAN ENGAGED FOR PREPARATION OF FEASIBILITY STUDY ESTIMATED INVESTMENT: Rs. 1500 CRORES SMELTER UP-GRADATION- ANGUL
0.5 MTPA SMELTER IN TWO PHASES OF 0.25 MTPA EACH 7000MU POWER NEEDED - 1250 MW CAPACITY COAL REQUIREMENT OF CAPTIVE POWER PLANT: 7.5 MILLION TONNES ESTIMATED INVESTMENT: Rs. 16,500 CRORES GREENFIELD SMELTER IN INDIA
4.2 MTPA MINES AND 1.4 MTPA REFINERY IN AP RESERVES ALLOTTED IN KR KONDA & GUDEM IN AP PFR PREPARED MINING PLAN UNDER PREPARATION DETAILED EXPLORATION ACTIVITY OF RESERVES TO START. AGENCY ENGAGED. INVESTMENT-Rs. 6000 CRORES. GREENFIELD REFINERY IN INDIA
INDONESIA 0.5 MTPA SMELTER AND 1250 MW POWER PLANT IN TWO PHASES ESTIMATED INVESTEMENT : USD 3.9 BILLION MOU SIGNED WITH GOVT. OF SOUTH SUMATRA. FEASIBILITY REPORT PREPARED. ALTERNATE LOCATION AT EAST KALIMANTAN EXPLORED. APPROVAL OBTAINED FROM INDONESIAN INVESTMENT COORDINATING BOARD PROJECT OFFICE OPENED IN JAKARTA EOI RESPONSES FOR IDENTIFICATION OF COAL SUPPLIER UNDER EVALUATION GREENFIELD SMELTER-ABROAD
INVESTMENT- ABROAD LOCATION: EAST KALIMANTAN (INDONESIA) SCHEDULED COMMISSION: 2015
1400 MW NUCLEAR POWER PLANT -JV WITH NPCIL ESTIMATED INVESTEMENT:Rs. 12,000 CRORES MOU SIGNED WITH NPCIL PROJECT IDENTIFIED JV AGREEMENT TO BE SIGNED – NOV’10 NUCLEAR POWER PLANT-JV WITH NPCIL
50 MW WIND POWER PLANT AT SUITABLE LOCATION HAVING WIND POTENTIAL ESTIMATED INVESTEMENT: Rs. 300 CRORE FEASIBILITY REPORT PREPARED SELECTION OF WIND FIRM DEVELOPER UNDERWAY SCHEDULED COMMISSIONING – OCT’11 WIND POWER PROJECT
FLY ASH UTILIZATION: SELECTION OF SUITABLE PARTNER FOR ESTABLISHMENT OF FLY ASH BASED CEMENT GRINDING UNIT AT ANGUL IN ADVANCE STAGE ALUMINIUM PARK MOU SIGNED WITH IDCO FOR ESTABLISHMENT OF ALUMINIUM PARK AT ANGUL IN JV FOR DOWNSTREAM AND ANCILLARY INDUSTRIES JV COMPANY REGISTERED UP & DOWNSTREAM INTEGRATION
ALUMINIUM WAGON PROJECT: Prototype aluminium wagon developed in collaboration with BEML. Undergoing RDSO inspection UP & DOWNSTREAM INTEGRATION • SPECIALITY ALUMINA : • Selection of JV partner for 100,000 MTPA is in progress.