190 likes | 376 Views
OTES & OPES DEADLINES/REQUIREMENTS/CHANGES. August 1, 2013. REQUIREMENTS. IMPROVEMENT OR GROWTH PLAN FOR EVERY TEACHER (2) TWO, 30 MINUTE OBSERVATIONS WALKTHROUGHS EVERY TEACHER (ORC 3319.111) EVERY YEAR EVERY LEA WILL USE ETPES (ORC 3319.111 SECTION G)
E N D
OTES & OPES DEADLINES/REQUIREMENTS/CHANGES August 1, 2013
REQUIREMENTS • IMPROVEMENT OR GROWTH PLAN FOR EVERY TEACHER • (2) TWO, 30 MINUTE OBSERVATIONS • WALKTHROUGHS • EVERY TEACHER (ORC 3319.111) EVERY YEAR • EVERY LEA WILL USE ETPES (ORC 3319.111 SECTION G) • OPES IS THE “ME TOO” CLAUSE WITH SOME LEINENCY
CHANGED • PROFICIENT is now SKILLED
September 30, 2013 Developing Ineffective Accomplished Skilled Performance on the Standards Continuous Improvement Instruction School Operations, Resources and Learning Environment Collaboration Parent and Community Engagement • 50%
STAYED THE SAME • Value Added remains the same percentage for the same implementation timeline • No talk of VA % in the proposals for the Biennium Budget Bill…yet
A: Teacher-level Value-Added Data Available A1. Teacher Instructs Value-Added Subjects Exclusively Teacher Value Added 26-50% LEA Measures 0-24% 2013-14 A2. Teacher Instructs Value-Added Subjects, but Not Exclusively Teacher-Level Value Added Proportional to teaching schedule 10-50% 0-40% LEA Measures Proportional to teaching schedule
A: Teacher-level Value-Added Data Available A1. Teacher Instructs Value-Added Subjects Exclusively Teacher Value Added 50% 2014-15 A2. Teacher Instructs Value-Added Subjects, but Not Exclusively Teacher-Level Value Added Proportional to teaching schedule 10-50% 0-40% LEA Measures Proportional to teaching schedule
C: No Teacher-level Value-Added or Approved Vendor Assessment Data Available
OPES Implementation • NOT dependent on OTES Implementation • Must implement THIS school year – 2013-2014 • ORC 3319.02 which became law 10/1/12 • Standards 2, 3 and 4 ARE appropriate for Assistant Principals and MUST be used • Standards 1 and 5 do not have to be utilized within the evaluation • ALL FIVE standards must be used for Principal Evaluations • ODE’s FAQ for OPES has been updated
Category A Principal: Principal Value Added 10-50%
Aggregate of SGM for Prinicpals • NOT average of averages • Composite Value Added • “Composite” of Vendor Assessment – requirement of being Approved vendor • “Composite” of Student Learning Objectives
Combining Teacher/Principal Performance and Student Growth Measures: Evaluation Look-Up Table
EDUCATOR EVALUATION TIMELINE [1]The board must require at least three formal observations of each teacher who is under consideration for non-renewal and with whom the board has entered into a limited contract or an extended limited contract.
OPES TIMELINE [1]Annual evaluation of principals ORC 3319.02– One evaluation annually if contract is not due to expire. In a year an employee’s contract is due to expire, at least a preliminary evaluation and a final evaluation shall be completed.