1 / 30

Sustainable water management strategy with spotlight on Indian Water Conservation experience

Sustainable water management strategy with spotlight on Indian Water Conservation experience. Case Study of Mysore Water Distribution. Oct 13, 2011 by G S Basu , Jusco, India. Agenda. India Urban Water Scenario JUSCO Mysore Experience Future of Sustainable Water Management in India. 3.

meli
Download Presentation

Sustainable water management strategy with spotlight on Indian Water Conservation experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainable water management strategy with spotlight on Indian Water Conservation experience Case Study of Mysore Water Distribution Oct 13, 2011 by G S Basu, Jusco, India

  2. Agenda India Urban Water Scenario JUSCO Mysore Experience Future of Sustainable Water Management in India 3

  3. Demand for water in India is expected to rise dramatically in the next few decades Drivers of water usage increase Water Demand in India; 2010 - 2050 Cubic KM or Trilion Liters Population • Population increase from 1.2 Billion in 2010 to 1.6 Billion in 2030 will directly increase demand for water Urbanization • Increased urbanization from 30% to 50% will create demand aggregation at select points in India, sometimes away from high water availability areas Per Capita Income Increase • Indian GDP is expected to grow causing per capita income to rise from $468 to $ 17366 by 2050. Increased per capita will result in lifestyle changes, requiring more per capita water. For e.g. water consumption in US is 582 litres/person / day compared to India’s ~90 Industrialization • India’s industrialization increase will increase demand for water – especially increase in power, steel and other heavy industries Per Capita Availability1,2 1,730 1,401 1,200 1: As per international norms, if per capita water availability is less than 1700 m3 per year, country is water stressed and if the per capita availability is less than 1000 m3, the country is water scarce 2: Using theoretical available water as a base for calculations Source: Ministry of Water Resources, National Hydrology Institute, Roorkee , 'The Himalayan Challenge: Water Security in Emerging Asia, Strategic Fore 4

  4. , Resulting in a potentially significant demand supply gap in the near future Water Supply and Demand in India; 2010 - 2050 Cubic KM or Trilion Liters River Basins in India, with water shortage, 2030 Percentage Demand 1,000 Current Supply 950 900 850 12% gap by 2025 800 +12% 750 Current useful water supply 700 0 Expected issue by 2015 2: EFR – Eastern Flowing Rivers; WFR – Western Flowing Rivers (non major rivers) Source: Ministry of Water Resources, National Hydrology Institute 5

  5. While India faces water shortage in near future, it already is facing significant issues in Urban areas Urban Water Requirement / Availability , 2007 Million Litres per Day Water Supply in a day on average, 2000 Hours Indian Population in Urban Areas, 2006 - 2025 Millions + Sewage and Waste Water Generation in Treatment, 2005 Million Litres per Day ? Domestic Industrial 1: 50 Asian cities benchmarked by ADB Source: Ministry of Urban Development, United Nations handbook of benchmarks, Central Pollution Control Board, Asian Development Bank 6

  6. 0.08 India has one of the lowest water tariff and tariff hike is a very sensitive issue Price to customers, 2009 USD per 1000 Litres • With abundant rainfall and extensive river systems, India has historically been a water rich country • Water has been considered “God’s gift” leading to water not seen as critical or finite resource that needs to be managed • Need to have a national regulatory authority to regulate water consumption, as for other natural assets such as air spectrum, is not easily conceived Common public perspective to water in India Germany United Kingdom • Common psyche about water as a “free resource • There is a lack of political will to consider increase in water tariff • Indian Municipalities rarely recover their costs of operations given low tariff rates Turkey United States Mexico South Africa Chile China Indonesia India 7

  7. Several municipal water bodies have poor operational and financial health Municipal Leakage and Metered Connections, 2010 Percentage, Millions Average Meter Connection per Employee, 2003 Count • ~45% of Municipal water supply is leaked - does not generate revenue • Connections not metered in ~40% cases Operating Ratio, 2007 • Operating Ratio is defined as O&M Costs / Revenue • Operating Ratio more than 1.0 indicates utility is not able to recover even O&M costs • Ideally a utility should have a operating ratio less than 1.0 to cover for capital expenditures • Most Indian utilities are performing poorly Source: Urban Water India, report by McKenzie-Ray, Asian Development Bank 8

  8. 2045 Private participation is expected to help in the following areas Access to funds for capital improvement Access to latest technology and tools including MIS More efficient operations and improved operating ratio Better consumer complaint handling systems Experience of urban water management in other geographies Knowledge and skill transfer to municipal body staff 9

  9. Agenda India Urban Water Scenario JUSCO Mysore Experience Future of Sustainable Water Management in India 10

  10. Purpose JUSCO – A Comprehensive Urban Infrastructure Service Provider A TATA Enterprise India’s only private sector integrated civic service provider • Services: • Water & Waste Water Management • Power Distribution and Infrastructure • Solid Waste Management • Construction Services • Integrated Maintenance • Environment Management Jamshedpur A town built on a promise 11

  11. JUSCO has been recognized for excellence in Urban civic services Total Productive Maintenance (TPM) Excellence Award held at Kyoto, 2008 National Urban Water Award for Consumer Satisfaction, 2009 Asian Water Management Excellence Award 2008 JUSCO received Global Water Intelligence Award in London, 2008 12

  12. Mysore – A Heritage city in South India • Area: 128.42 km2 • Population: 1,000,000 • Location: 12°18′N 76°39′E • Elevation: 763 metres (203 ft.) Mysore City Facts Mysore Palace • Demon Mahishasura supposedly k killed in this town • One of the princely states at time of independence • Strong Arts Heritage • “Cultural Capital of Karnataka” Mysore History Karnataka Mahishasura Mysore • TourismHot spot within Karnataka • Large Software exporter • Significant handicrafts industry • Sandalwood carving, Bronze work, Mysore Economic Profile Jayalakshmi Vilas 13

  13. Mysore Water Distribution Background Mysore Water Distribution Background Cauvery River • Source of water Cauvery river fairly dependable • Civic Services administered by a Municipal Corporation (MCC) • City Council has a Mayor and Deputy Mayor; 65 elected Corporators each representing a Revenue Ward. • Core municipal area about 84 sq km. City expanding and MUDA responsible for planning & development; Master plan area: 150 sq km. • Karnataka Urban Water Supply and Drainage Board (KUWSDB) is responsible for water supply Mysore City Corporation (MCC) Mysore Urban Development Authority (MUDA Boundary) 14

  14. % Mysore Water Distribution facing significant issues… Issues for Consumers Issues for KUWSDB/MCC Background for Mysore Distribution + • Water available for 3-5 hours per day in West Zone and every alternate day in East Zone • Water availability at erratic hours – middle of night, very early morning etc. • Inadequate water pressure, requiring people to install booster pump on water lines • Water contamination due to old / rusted pipes • Inspite of a good water source (Cauvery river) being close, there is additional cost borne for bore wells and tankers to meet customer demand • NRW in excess of 40% • Poor collections from consumers • Low tariff levels – many consumers billed on avg consumption because of non functional meters • Bulk water production assets have outlived age • KUWSDB is implementing a bulk augmenting arrangement • Distribution system in the city dates back more than 100 years • 18 Boosting stations provided to provide pressurized water • Around 20,000 unauthorized connections over a base of 126,000 • ~ 80% meters not functional • Tap pressure ~ 3-5 m, as opposed to 7 m, as per norms in India 15

  15. % Mysore Civic bodies envisaged a program to solve water issues through private participation • Name of Project…………… • Job Description…………… • Client……………………… • Project Aim………………… • Contract Start Date……… • Completion Time………… • Value……………………… • Funding arrangement • 24X7 Water Supply performance based management contract in Mysore city. • Conversion of intermittent to 24/7 continuous water supply system for 130,000 connections • Mysore City Corporation (MCC) & Karnataka Water Supply & Drainage Board (KUWSDB) • To enable a profitable Urban Local Body (ULB); Reduce losses and improve consumer experience by providing 24x7 water • 28/01/2009 • 72 months • Rs. 1,620 Million (~USD 36 Million) • JNNURM:StateGovt:MCC – 80:10:10 16

  16. Responsibility for entire water cycle to be shared between public and private parties Urban Water Supply Cycle Abstraction / Treatment Transmission Distribution Waste Water Collection and Treatment Party KUWSDB/MCC Contractor (Jusco) KUWSDB/MCC KUWSDB/MCC • 170,000 connections of which 120,000 authorized connections • 1700 KM of piping network • Consumer complaint handling • Metering and Billing • Revenue collection improvement • Responsible for waste water collection and treatment before release to Cauvery waters • Around 240 MLD water bulk supply from Cauvery river tapped at 3 different areas • 4 Water Treatment Plants (WTP) under management by KUWSDB • Bulk water to WTP and Treated water to Master Balance Reservoir (MBR) under scope of KUWSDB • 6 MBRs to balance water supply having capacity of 126 ML Notes 17

  17. % Phase 1: Preparatory Phase 2: Rehabilitation Phase 3: Management Mysore Project to be executed in three phases • India’s largest PPP project covering a population of 1 Million • Rehabilitation of ~ 1700 KMs of pipeline, pump stations, electrical and allied work • Operation, and maintenance phase • Operation, maintain and improve facilities and provision of water services • Implementation of Final Investment Plan involving procurement, construction (new network, valves, meters, customer connections, creation of DMA etc), commissioning • Implementing Integrated Management Information System (IMIS) • Study existing water infrastructure & service • Prepare O&M plan • Topographical and customer survey for for compilation of customer database • Hydraulic network modeling & design for rehabilitating the intermittent Supply network to Continuous Water Supply • 1 year • 3 Years • 2 Years 18

  18. % SalientFeatures of the Contract… Revenue and Risk Sharing Performance Gurantees + • Tarriff fixed by Municipal body, Operator to bill consumers and pass the revenue to the municipal body • Risk sharing between Urban Local Body (ULB) and Contractor • Investment risk with ULB / Government (source of funds) • Tarriff risk with ULB • Design and Construction risk with Contractor • Performance risk with Contractor • Operation risk with Contractor • Collection risk with Contractor • Performance based management contract • Contractor revenue linked to several performance parameters 19

  19. % JUSCO Approach for Project Execution Rehabilitation of existing network 2a • Work break down packages for execution • Prioritizing the works for execution • Implementation of Rehab plan • Service level targets delivered in stages • Manage Issues Relating to Change in supply pattern to 24X7 Development of Capital Improvement Plan 1 Operations and Maintenance of existing network 2b • Asset Mapping • Measuring bulk inputs and outputs • Base lining of losses, existing service levels • Establishment of DMAs, Water Balance • Hydraulic Modeling & Investment Plan • Customer centre with SLGs defined • Standardization of O&M practices • Active leakage management • Meter Management • Incentive based billing and revenue collection • Integration of mapping, billing, customer care & network management • Safety Management • Total Productive Maintenance (TPM) Practices 20

  20. Project close to mid point in duration Connections, 2009 – 2014 Units Contract Agreement – 28 Nov 2008 Project Start Jan 2009 Start of 6 monthly Performance Milestones First Performance Target – 10k 24x7 connections We are here Next 6 monthly milestone of 70k 24x7 connections Jan 2009 Jan 2010 Jan 2011 Jan 2012 Jan 2013 Jan 2014 Jan 2015 12 months Preparatory Phase 36 months Operation & Rehabilitation Phase 24 months Maintenance Phase

  21. Already improvement in consumer satisfaction noticed Top factors in consumer satisfaction score* Water Quality Percent +40% Consumer satisfaction score, 2009 – 2010 Percent 95 2009 2010 +14% Water Availability Percent +22% Independent study by AC Nielsen India 76 2009 2010 Metering Percent +19% 60 2009 2010 x Importance to customers *Out of 8 factors including others such as Collection, Billing, Safety Measures and Behavior of staff 22 2009 2010

  22. Agenda India Urban Water Scenario JUSCO Mysore Experience Future of Sustainable Water Management in India 23

  23. Indian Utilities face several challenges (1/2) • All connections to be metered backed up by efficient meter management process • Move from flat tariff to consumption based telescopic tariff structure to reflect economic status of the consumer and the usage, including subsidy tariff for “Lifeline supply” and facilitating demand management • Cross subsidy between domestic and industrial/commercial connections in tariff structure 2 Low water tariff resulting in poor recovery on investments Possible way forward thru PPP approach Challenges • Improve service delivery thru introducing robust operation Management processes • Consumer focus through 24x7 complaint handling and prompt response • Capture consumer data for decision making and providing analytical support for solving issues thru IT enablement • KPI for customer service level guarantee 1 Weak focus on customer * Jawaharlal Nehru Urban Renewal Mission 24

  24. Indian Utilities face several challenges (2/2) Possible way forward thru PPP approach Challenges • Adoption of technologies and good management practices • Meticulous benchmarking of good practices and processes • Ring fencing of accounting system • Structured skill enhancement programme for ULB staffs High operational costs and not satisfactory staff productivity 3 • Improved revenue collections to improve funds availability backed up by efficient IT enabled consumer billing process • Possible corporatization for revenue and cost management thru proper ERP module • Support from State and Centre such as JNNURM* • Support thru soft loan from multilateral agencies • Last mile connection cost to be borne by consumers to reduce investment • Additional revenue thru NRW reduction and tariff restructuring to repay loan and recover O&M cost • Efficient use of assets with periodic good maintenance practices • Efficient and innovative hydraulic modeling of network to reduce capital investment 5 Crumbling Infrastructure and limited funds for capital maintenance or service improvement • Track and report NRW for every urban ward • Active Leakage Management • Physical audits to address illegal connection High level of Transmission & Distribution losses 4 * Jawaharlal Nehru Urban Renewal Mission 25

  25. How Private participation can help ULBs (1/2) – example JUSCO’s experience in Jamshedpur Results (2005) Baseline Parameter Unit Results (2010) Population Covered 85% JUSCO was formed as a corporate urban utilities service provider for Jamshedpur town in 2004. 67% % of Total Metered Connections 30% ~0 % of Total NRW 36% 9.5% % Service Guarantee Compliance 77% 99% % of Total Failures in Water Systems 44 1.1 No per Month Operating Ratio O&M Cost / Revenue 1.07 0.82 Staff/1000 connections 4.03 Nos > 8.0 26

  26. How Private participation can help ULBs (2/2) – example JUSCO’s experience in Haldia Results (2010) Results (2008) Baseline Parameter Unit 27 JUSCO took over Haldia city water supply as BOT cum Concession agreement with Haldia Development Authority (HDA) from Nov 2008. Water Production 19.7 MGD 23.6 Water Sale 15.2 MGD 9.7% NRW 25% % 99% Service Guarantee Compliance NA % of Total 94 Critical equipment availability 85 % 27

  27. Private sector participation in urban water management is becoming popular after initial reservations Graph Indicative Overall momentum for PPP in Water Sector Mid 90s Early 2000 Mid Decade 2010 2015 • Renewed interest by International Cos. • Increased involvement by Domestic Cos. Interest • High Interest by Foreign Players • New Concept for Indian Companies • Very little interest • Ineffective push from the Government • High Government focus • Domestic Interest • Many ongoing projects • Commercial Success being closely monitored • First initiatives • Poor results and lack of momentum • Many projects grounded • Few projects • Onset of pessimism on Water PPP • High level of Public and NGO opposition • High profile projects grounded Activity • Latur • Madurai • Chennai • Nagpur • Salt Lake* • Mysore* • Haldia* • Mumbai Kurla East • DJB Pilot • Bangalore DMA • Sangli • Pune • Hyderabad • Goa • Bangalore Key Projects • Sonia Vihar WTP Source: CRISIL 28 * JUSCO Projects

  28. h Private Sector Expectations from Government for Water Utilities Market Development • Develop regulations that assure certainty of future cash flows to the extent possible • Provide political commitment for PPP as water is not perceived as a simple commodity by either the consumers or the Government • Align economic interest of all parties • Accept that profit from water business is OK • Define PPP projects on a holistic basis • Encourage plurality of approach and establish a framework that accepts failures • Offer a project with detailed project due diligence including adequate stake holder engagement Source: ILFS 29

  29. h Thank You 30

More Related