1 / 21

Wiring Halls of Residence – Progress and Pitfalls

Wiring Halls of Residence – Progress and Pitfalls. Jeremy Perkins Assistant Director Central IT Services University of Wales Aberystwyth. Background Decision in 1999 to wire all hall rooms Looked at commercial solutions. Background They would have been ISP

Download Presentation

Wiring Halls of Residence – Progress and Pitfalls

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wiring Halls of Residence – Progress and Pitfalls Jeremy Perkins Assistant Director Central IT Services University of Wales Aberystwyth

  2. Background • Decision in 1999 to wire all hall rooms • Looked at commercial solutions

  3. Background • They would have been ISP • All wiring would have been done over one summer • Advisory support through year

  4. …. but • £100/room/yr, paying for all rooms for 7 years

  5. …. but • £100/room/yr, paying for all rooms for 7 years • Several solutions were low bandwidth • Business case based on telephony revenue

  6. In-house solution • Job being done over three years • cost less than 2 years payment to typical commercial outfit • £75 charge per year for room paying off University ‘loan’ by 2005

  7. Where we are • Half rooms done by last autumn • 2/3rds will be done for academic year 2002/3

  8. Where we are • Half rooms done by last autumn • 2/3rds will be done for academic year 2002/3 • Substantially bigger take up than expected

  9. The downside • UWA acting as ISP

  10. The downside • UWA acting as ISP • I.S. high profile as students paying

  11. The downside • UWA acting as ISP • I.S. high profile as students paying • Hidden resource costs important

  12. The positive side I.S. retain control of important UWA computing provision and have responsibility for delivering good service

  13. The positive side I.S. retain control of important UWA computing provision and have responsibility for delivering good service How keen should we be to outsource key new services?

  14. The positive side (with a University hat on if I can make it fit) Cost-effective solution minimising loss of Residential Services revenue

  15. What now? Complete the initial project ready for academic year 2004

  16. What then? Ensure continuing income for: • Support person • Difficult outlying Halls • ““Academically justified”” increases in bandwidth

  17. What then? Likely to move to annual lump sum when 50% of students in cabled Halls on network

  18. Why lump sum? • Admin costs

  19. Why lump sum? • Admin costs • Paid for services very sensitive

  20. Why lump sum? • Admin costs • Paid for services very sensitive • “Free Internet Connection” excellent advertising

  21. Wiring Halls of Residence – Progress and Pitfalls Jeremy Perkins University of Wales ABERYSTWYTH jwp@aber.ac.uk

More Related