An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Установочные центры (2-й этап типового проекта OEM ) • 12 установочных центров OEM функционируют при азавтозаводах • 6 в Италии ,6 в Европе • Производственная мощность: 1600 автомобилей в день

  2. Installation centres (Stage 2 OEM project type) • 12 Installations centers nearby OEM facilities • 6 Italy – 6 Europe • Conversion capacity: 1.600 cars/day

  3. Conversion: General Process Flow (Stage 2 OEM project type) Dedicated ext. incoming area (cars ready to enter in the working area) Parking/ stock area FIFO and traceability managment INComing area Wharehouse area Ext. storage areas – dedicated and identified areas to manage the delivery steps and B&H Preassembly area Phase A areas Phase B areas (hoist) Standardized process – JES/ SOS/ Activity certifications/ Quality checks/ SPC in line/ click torque wrenches verification per shift Phase C areas Ready to be filled (lpg) Ready to be tested (lpg dynamic test, S&R and leakage test) Phase D areas (VLO) Ready to be checked (GCA) Ready to be shipped (B&H)

  4. OEM customer proposal OEM PROJECT CO-DESIGN PRODUCT KIT / COMPONENTS AFTER SALES SERVICES CONVERSION Tech Line Flying Doctors Spare parts Train the trainer ......... OEM Projects Types: Stage 1-2 or “0KM”

  5. Основные партнеры Europe Rest of the world Cars Group Group LCVs