190 likes | 287 Views
MacLeod Public School Revitalization. February 2012. MacLeod Public School. Agenda. Process Existing Site Plans Site Layout Plans Temporary Accommodation Timelines Questions. Existing Site Plan. Aerial View of Existing Site. Current Statistics for MacLeod Public School .
E N D
MacLeod Public School Revitalization February 2012
Agenda • Process • Existing Site Plans • Site Layout Plans • Temporary Accommodation • Timelines • Questions
Current Statistics for MacLeod Public School • Enrolment at October 31, 2011 – • 563 students, JK to 8 • Number of staff - 43, plus 4 daycare staff
Current Statistics for MacLeod Public School (con’t) • Annex, Main Building and modulars are a total of 47,878 square feet • Approximately 50 parking spaces • Play area is 115,100 square feet • No separate bus layby or loading zone
Current Statistics for MacLeod Public School (con’t) • Dedicated daycare space consists of one classroom (16 toddlers) • The Before and After daycare program operates out of shared space with the school • The Hub is operating after hours in shared space with the school and the Hub office is located at Lockerby Composite School
New Green School (con’t) • Anticipated completion date of fall 2013 • Build a school for 600 pupil places • Approximately 69,000 square feet
New Green School (con’t) • Full daycare with a mix of infants, toddlers and preschoolers for a total of 49 children • The Hub office will be relocated from Lockerby Composite School to the New Green School • Designed to allow for future expansion
New Green School (con’t) • 93 parking spaces • Play area approximately 173,900 square feet • The main entrance to the school will be off Walford Road with a separate bus layby off Laval Street and exiting off Walford Road
Green Features • Geo-Thermal Heating and Cooling System • Displacement Ventilation and • Heat Recovery System • Radiant floor heating
Green Features (con’t) • High insulation values in windows, walls and floors • Energy efficient plumbing and lighting fixtures • The roof will be constructed to allow for the installation of solar panels at a later date
Temporary Accommodation • JK to Grade 2 students as well as the daycare will remain at the Annex. • Grades 3 to 8 students will be relocated to the Wembley site as of Monday, March 19th until the completion of the project.
Transportation • Regular bus routes will be maintained. In the morning, students will be dropped off at the Annex and the bus will then continue to the Wembley site. • In the afternoon, students will be picked up at the Wembley site, then proceed to the Annex.
Bell Times for MacLeod, Grade 3 to 5 • Grades 3, 4, 5 • Entry Bell 8:35 • Block1 8:40-10:40 am • Break 10:40-10:55 am (15 minutes) • Block2 10:55-11:55 am • Break 11:55-12:35 pm (40 minutes) • Block 3 12:35-2:35 pm • Exit Bell 2:35 pm
Bell Times for MacLeod, Grade 6 to 8 • Grades 6, 7, 8 • Entry Bell 8:35 • Block1 8:40-10:40 am • Break 10:40-10:55 am (15 minutes) • Block2 10:55-12:35 pm • Break 12:35-1:15 pm (40 minutes) • Block 3 1:15-2:35 pm • Exit Bell 2:35 pm
Timelines • Friday, February 17, 2012 • Letters will be sent to parents/guardians for students who are impacted Monday, February 27, 2012 • Community Information Night, 6 pm to 7 pm • Friday, March 2, 2012 • Contents of the Main Building to be packed • Week of March 3 to 9, 2012 • Moving the contents of the Main Building to the MacLeod, Wembley site • Friday, March 9, 2012 • Main Building staff unpack and set up classrooms at the MacLeod, Wembley Site for Grades 3 to 8