1 / 5

Theoretical Volume of Shaft 55 yds 3 42.0 m 3

Theoretical Volume of Shaft 55 yds 3 42.0 m 3. Symmetrical Steel Casing. 2-D Wire Frame SoniCaliper Illustration. Bottom of Casing. Protrusion - due to “chasing” boulder through construction process. 2-D Wire Frame SoniCaliper Illustration. Bottom of Casing.

Download Presentation

Theoretical Volume of Shaft 55 yds 3 42.0 m 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Theoretical Volume of Shaft 55 yds3 42.0 m3

  2. Symmetrical Steel Casing 2-D Wire Frame SoniCaliper Illustration Bottom of Casing Protrusion - due to “chasing” boulder through construction process

  3. 2-D Wire Frame SoniCaliper Illustration Bottom of Casing

  4. CAD Image

  5. Theoretical Volume of Shaft 55 yds3 42.0 m3 Estimated Volume of Shaft by SoniCaliper 132 yds3 100.9 m3 Actual Poured Volume of Shaft 134 yds3 102.5 m3