An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to the Innovation Cluster of Kazakhstan “Park of Innovative Technologies” development review

  2. “Park of Innovative Technologies” Is the site for the creation of high-tech industries

  3. “Park of Innovative Technologies” established by the Decree of the President of the Republic of Kazakhstan from 18.08.03. number 1166 Opening of SEZ PIT took place in September 2006

  4. “Park of Innovative Technologies” Opening of SEZ PIT took place in September 2006 2003-2011y.y. – development of 1 phase

  5. “Park of Innovative Technologies” Opening of SEZ PIT took place in September 2006 2003-2011y.y. – development of 1 phase In 2011 yearSEZ PIT was felledby companies only on 30%.

  6. “Park of Innovative Technologies” Opening of SEZ PIT took place in September 2006 2003-2011y.y. – development of 1 phase In 2011 yearSEZ PIT was felledby companies only on 30%. Production shops were empty

  7. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

  8. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011 2. Introduced unprecedented preferences for SEZ participants

  9. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011 2. Introduced unprecedented preferences for SEZ participants 3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies.

  10. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011 2. Introduced unprecedented preferences for SEZ participants 3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies. 4. There were started the construction of scientific research Center of Kazakh Institute of Oil and Gas

  11. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011 2. Introduced unprecedented preferences for SEZ participants 3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies. 4. There were started the construction of scientific research Center of Kazakh Institute of Oil and Gas 5. Now are finishing the construction of Date Center of JSC “Kazakh Telecom”

  12. In 2011, on the instructions of the Head of State there were made ​​the "reset" of the Park 1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011 2. Introduced unprecedented preferences for SEZ participants 3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies. 4. There were started the construction of scientific research Center of Kazakh Institute of Oil and Gas 5. Now are finishing the construction of Date Center of JSC “Kazakh Telecom” Now 100% all buildings are filed by the companies Tax from с 2005y. – 3,5 billion тенге (at 5 monthsin 2013y. – 772 million тенге)

  13. “Park of Innovative Technologies” The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor

  14. “Park of Innovative Technologies” The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor The park becomes as a center of technological competence in the areas of:  information technology

  15. “Park of Innovative Technologies” The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor The park becomes a center of technological competence in the areas of:  communication equipment

  16. “Park of Innovative Technologies” The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor The park becomes a center of technological competence in the areas of:electronic devices

  17. The 2nd phase are started

  18. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

  19. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

  20. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

  21. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU 4. Designing of the 2nd stage of industrial park NATD

  22. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 5. Completed the design of world-class college "KASIPKOR" 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU 4. Designing of the 2nd stage of industrial park NATD

  23. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 5. Completed the design of world-class college "KASIPKOR" 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU 4. Designing of the 2nd stage of industrial park NATD 6. Considering the issue of building LG Electronics Factory

  24. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 5. Completed the design of world-class college "KASIPKOR" 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU 4. Designing of the 2nd stage of industrial park NATD 6. Considering the issue of building LG Electronics Factory 7. A decision on the construction of social amenities zone Estate Fund Samruk-Kazyna

  25. The 2nd phase are started 1. Approved construction documents for the construction of the second phase of infrastructure (140 ha) 5. Completed the design of world-class college "KASIPKOR" 2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013 3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU 4. Designing of the 2nd stage of industrial park NATD 6. Considering the issue of building LG Electronics Factory 7. A decision on the construction of social amenities zone Estate Fund Samruk-Kazyna 8. Worked out the construction of a joint innovation and service center HEWLETT-PACKARD COMPANY and JSC "NC" KTZ "

  26. Joint innovation and service center HEWLETT-PACKARD COMPANY and JSC "NC" KTZ " The volume of investments:> $ 200 million Implementation period: 2013-2014 years Number of Jobs: 3000 (plan) Probable area laboratories: 18,000 sq.m. Fast start by supporting 23 HP labs around the world. • DEVELOPMENT: • Replicability of IT products and information systems • MEASURING SYSTEMS FOR THE NEEDS OF RAILWAY TRANSPORT- • Microprocessing devices for railway control • METHODOLOGY AND TECHNOLOGY MANAGEMENT • SERVICE: • IMPLEMENTATION OF JOINT TECHNOLOGY "KEY" • TECHNOLOGICAL SUPPORT • UTILITY SERVICES OUTSOURCING • JOINT PRODUCT PORTFOLIO Consumers: More than 100 railway companies around the world Annual consumer market: more than $ 200 billion

  27. ICT Cluster PIT "Alatau" Меморандум с 4 мировыми венчурными фондами: Czech ICT Alliance, Segment Interactive (США), Softline ventures (РФ), Tex Drive (РФ) Found of ICT development КАЗАХСТАНСКО-БРИТАНСКИЙ ТЕХНИЧЕСКИЙ УНИВЕРСИТЕТ The participants of the ICT cluster КАЗАХСКИЙ НАЦИОНАЛЬНЫЙ ТЕХНИЧЕСКИЙ УНИВЕРСИТЕТ ИМЕНИ К.И. САТПАЕВА StartUp-companies В портфеле -165 проектов 4 проекта профинансировано - 12 млн. тг. 6 проектов будет профинансировано до конца года ICT - business R&D-Labs • 87 ИКТ компаний 450 ИКТ-компаний в РК • 1600 рабочих мест35 тыс. ИКТ-специалистов в РК • 70 студенческих проектов • 5 производств ИКТ Оборудование ЦОД • 5 R&D центровHP, Microsoft, Fraunhofer • 800 сертифицированных инженеров • 26 специализированных курсов • 2тестовые площадки. • 17 учебно-исслед. лабораторий • IBM, Apple, Huawei ,SAP

  28. International University of Informational Technologies Education program from iCarnegie Mellon 1 in the world in Computer Science joint training U.S., South Korea, Malaysia, Spain Prizes in international competitions ACM, ROBOCON, IT-Planet 3d – принтеры, «антисон», казахская клавиатура, 3 робота: автоматический, с ручным управлением и агрегат-коллектор 70 student projects :

  29. High-tech manufacturing 2011 г. 2012г. 2013г. Personal computers Fibre Alfa Network Logycom Logycom(экстерриториально) 2014г. Pad Servers ResiversDVB-S2 и DVB-Т2 EquipmentGPON Завод им. Кирова ELTEX Алатау «Мобильные технологии» • In SEZ PIT registered 87 ICT companies, 16 of which extraterritorially

  30. Park of innovative technologies 3.0 – creation of intellectual quarters in Almaty Established on the basis of academic buildings Kazakh National University. Al-Farabi autonomous territory with the regime SEZ PIT for the implementation of ICT projects (extraterritoriality 2015); Goal: to create favorable conditions for IT professionals and organizations, and to promote cooperation between them, the involvement of students and teachers located near universities in Almaty Description: 4-level building (Masanchi - Kirov) area of ​​4000 square meters. meters. 5-level building (Masanchi - Vinogradov) area of ​​7000 square meters. meters.

  31. Expected results of the Park of innovative technology by 2020 The number of operating companies The total income of companies The total income of companies Export earnings The day average of people 250 60 150 billiontg/year 40% 50 000

  32. Short-term action plan To acseptthe Law of RK "On the innovation cluster "Park of innovative technologies" 2. Begin construction of the infrastructure of the 2nd turn SEZ 2013 3. Start the construction of the 2nd stage of industrial park "Alatau" 4. Complete construction of the data center JSC "Kazakhtelecom" 5. To hold the first meeting of the Board of Trustees 6. Complete the construction of a research center AO KING 7. Complete construction of the 2nd stage of industrial park "Alatau" 2014 8. To begin the construction of a joint research center AO KTZ and HP 9. Complete the construction of the campus KBTU 10. Complete construction of infrastructure 2nd phase of SEZ 2015 11. Attract companies to manage Jurong SEZ 12. Expansion of the territory of SEZ PIT

  33. Our region Almaty City 1 2 Technopark ALATAU 3 4 Kazakh National University of Al-Farabi Kazakh National Technical University International Informational Technology University

  34. Why not to join the cluster? Production Area Almaty City Intellectual Blocks 1 2 Technopark ALATAU 3 4 Kazakh National University of Al-Farabi Kazakh National Technical University International Informational Technology University

  35. We identified some key factors Almaty City Intellectual Blocks

  36. We identified some key factors Almaty City Intellectual Blocks The concentration of researchers, professors, students (IT specialists) Today in Almaty operate 52 universities, 69 colleges and 11 vocational schools. The number of young people aged 14 to 29 years is 390 000 people or 30% of the total population of the city. The number of students is 265 000 people, of whom 187 000 are enrolled in universities, 65 colleges, 500.

  37. We identified some key factors Almaty City Intellectual Blocks The concentration of researchers, professors, students (IT specialists) The presence of customers (companies) Almaty has developed trade business, so many companies sell and service at the center of the city

  38. We identified some key factors Almaty City Intellectual Blocks The concentration of researchers, professors, students (IT specialists) The presence of customers (companies) Financial centers - Venture Capital Strategically located to ensure maximum visibility and identity, the individual buildings create an ensemble that establishes a unique monumentality on Al-Farabi Avenue.

  39. We identified some key factors Almaty City Intellectual Blocks Recreational facilities (parks, movie theaters, restaurants, etc.) The concentration of researchers, professors, students (IT specialists) The presence of customers (companies) Financial centers - Venture Capital buildings, places that provides a particular service or is used for a particular industry

  40. We identified some key factors Almaty City Intellectual Blocks Transport and logistics factor Recreational facilities (parks, movie theaters, restaurants, etc.) The concentration of researchers, professors, students (IT specialists) The presence of customers (companies) Financial centers - Venture Capital Availability of public transport, the presence of underground stations, the smallest traffic on the road, etc.)

  41. We identified some key factors Almaty City The developed science infrastructure (research centers, laboratories, broadband network, etc.) Intellectual Blocks Transport and logistics factor Recreational facilities (parks, movie theaters, restaurants, etc.) The concentration of researchers, professors, students (IT specialists) The presence of customers (companies) Financial centers - Venture Capital

  42. We have several intelligent blocks Almaty City 1 Intellectual Blocks 2 3 4 Intersection of the key factors has identified several intelligent quarters

  43. From 52 universities we selected 4 Almaty City 1 2 Technopark ALATAU 3 4 Kazakh National University of Al-Farabi Kazakh National Technical University International Informational Technology University

  44. Example of an intellectual block: “KAZGU GRAD”

  45. “Park of Innovative Technologies” Is for anchor projects Technopark ALATAU