1 / 7

Theta TRB: under MoB Alignment upgrade: MiniMABs of S4-S10 is considered upgrade

C. F. Bedoya April 9th , 2013. 1. UPGRADE EXPENSES. Theta TRB: under MoB Alignment upgrade: MiniMABs of S4-S10 is considered upgrade Rest under MoB , although both things mixed... (next slide) SC relocation costs: - extra A3050 purchased from MoB (87.6 kCHF )

melody
Download Presentation

Theta TRB: under MoB Alignment upgrade: MiniMABs of S4-S10 is considered upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C. F. BedoyaApril 9th, 2013 1 UPGRADE EXPENSES • Theta TRB: under MoB • Alignment upgrade: • MiniMABs of S4-S10 is considered upgrade • Rest under MoB, although both things mixed... (next slide) • SC relocation costs: • - extra A3050 purchased from MoB (87.6 kCHF) • - Pattern units first prototypes 14 keuros from MoB • - Slow Control boards from MoB • - Opal Kelly for final Pattern units 8.4 kCHF • SC reloc, upgrade account • - Fibers 163 kCHF ( + 3 extra cables to be purchased now) • - 6 u. Wiener crates 43 kCHF ( + 36 kCHF for the final 5 u.) • - Avago receivers 102 kCHF • - 20 u. fan outs 3 kCHF (+ aprox 400 u. pending , 133 kCHF) • aprox 180 kCHF to be spent from upgrade account (present balance 291 kCHF)

  2. C. F. BedoyaApril 9th, 2013 2

  3. C. F. BedoyaApril 9th, 2013 3 Oct 2012. Spain 106 keuros (132.5 kCHF) March 2013. Spain 24 keuros (30 kCHF) Would need inputs from rest of the institutes

  4. C. F. BedoyaApril 9th, 2013 4 From Upgrade Project Office

  5. C. F. BedoyaApril 9th, 2013 5

  6. C. F. BedoyaApril 9th, 2013 7

More Related