1 / 25

TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX

TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX. CDM in Egypt Cairo, January 12-13, 2004.

Download Presentation

TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Egypt’s National Strategy Study (NSS)on theClean Development Mechanism (CDM)Presented by:Dr. Attia Saad El-DinDr. Yosry BarakatTIMS

  2. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Project Execution Energy & Environment Research Center (E2RC)/ Tabbin Institute for Metallurgical Studies (TIMS) Under Umbrella of Climate Change Unit / Egyptian Environmental Affairs Agency (EEAA) In Cooperation With The World Bank (WB) & Ernst + Partners Ltd. (EBP)Government of Switzerland

  3. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Content • Introduction • Conventional & CDM Project Inputs & Outputs • CDM Strategy Objectives • CDM Benefits in Egypt • CDM Barriers in Egypt • Institutional Setup • Eligibility Criteria • Ranking Criteria • CDM Projects Portfolio • CDM Projects Pipeline

  4. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Introduction • One of the mechanisms for international GHG abatement is the Clean Development Mechanism (CDM), as described in Article 12 of the Kyoto Protocol: • In short, an Annex I country (or firm) pays for GHG mitigation in a developing country through CDM projects and purchases the resulting measurable reduction of GHG emission in the host country. • A CDM project has to comply with the criteria set by the Kyoto Protocol and has to be approved by the host and investor countries. • The investing paying country obtains certified emission reductions, which it can use to comply with its Kyoto commitment.

  5. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Equity Investment Conventional Project Financial Returns Conventional Project Inputs and Outputs

  6. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Other Development Benefits Equity Investment CDM Project Carbon Credits Financial Returns Carbon Investment CDM Project Inputs and Outputs

  7. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 CDM Strategy Objectives • Establishing a national mechanism for the selection, coordination, facilitation and implementation of CDM projects. • Identifying the roles of the different Egyptian institutions within the CDM project cycle. • Preparing a pipeline of CDM projects. • Assessing GHG reduction potential in Egypt and the competitiveness in the international GHG market. • Identifying national capacity building needs.

  8. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 CDM Benefits in Egypt • Financial Flow • Improvement of Local Environment • Technology Transfer • Creation of Jobs

  9. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Barriers that could be addressed by CDM investment

  10. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX Existing National Governmental Institutions Participating in the CDM Ministry of State for Environ-mental Affairs (MSEA) Ministry of Petroleum (MOP) Ministry of Electricity & Energy (MEE) Ministry of Industry & Technological Development (MITD) Ministry of Agriculture and Land Reclamation (MOALR) Ministry of Transport (MOT) • Egyptian Environmental Affairs Agency (EEAA), Climate Change Unit • Environmental Protection Fund (EPF) • The Egyptian General Petroleum Corporation (EGPC) • Egyptian Natural Gas Holding Company (EGAS) • New & Renewable Energy Authority (NREA) • Organization of Energy Planning (OEP) • Tabbin Institute for Metallurgical Studies (TIMS) • Egyptian Accreditation Council (EGAC) • The Central Department for Afforestation & Environment CDM in Egypt Cairo, January 12-13, 2004

  11. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Existing Private Sector Institutions and NGOs with CDM Potential Federation of Egyptian Industries (FEI) Private Audit/ Consulting Firms World Energy Council (WEC) Environmental NGOs The Egyptian Energy Service Business Association (EESBA) Energy Efficiency Council (EEC)

  12. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Criteria for CDM Projects • The CDM operates basically on a project level • The projects meeting essential (Mandatory) criteria (ELIGIBILITY CRITERIA): • Real and measurable reduction of GHG emission compared with baseline scenario • Simple payback period ought to be more than two years • The proposed CDM project must be in areas where no national development plans have been formulated

  13. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Criteria Indicators for Ranking and Prioritising CDM Projects • Point system based on allocated weight and score for each of the following indicators: • Economic benefits • Environmental benefits • Social Benefits

  14. Value added Infrastructure Export potential Import substitution Employment Salaries and taxes Foreign investment Payback period State of technology Energy savings TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Economic Benefit Parameters

  15. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Environmental Parameters • Overall environmental performance • Environmental management systems • Implementation of eco-efficiency and cleaner production techniques • Self-monitoring and auditing

  16. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Social Parameters • Percentage of employees covered by social insurance • Percentage of female employees to total • Presence of programmes for vocational training • Awards bonuses and other incentives programmes • Presence of programmes for summer internship & training • Social & fringe benefits

  17. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 CDM Pilot Projects Pipeline

  18. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Overview of the Project Portfolio

  19. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Overview of the Project Portfolio

  20. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Overview of the Project Portfolio

  21. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Overview of the Project Portfolio

  22. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Overview of the Project Portfolio

  23. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM Projects Pipeline Project #1 Cogeneration Project of 3.5 MW Capacity at Misr Elmonifia Company (Textile) Project #2 Control System and Energy Saving Equipment at Zenotex Project #3 Installing Dedicated CNG Engines to Replace Low Efficiency Diesel Engines Project #4 Establishment of Forest Plantations and Shelterbelts Around 10th of Ramadan City Project #5 Afforestation of a Part of Cairo-Aswan Highway Project #6 CDM 60 MW Wind Farm in Comparison with BAU 45 MW Steam Turbine (Mixed Fuel) Project #7 Organic Solid Waste Digestion CDM in Egypt Cairo, January 12-13, 2004

  24. TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEX CDM in Egypt Cairo, January 12-13, 2004 Conclusions from the National Strategy Study on CDM in Egypt • There is a significant potential for CDM in Egypt: • Projects • People and institutions • CDM opens business opportunities and benefits to Egyptian stakeholders • Steps needed to make use of this potential: • Capacity building • Institutional setting • Pilot projects

  25. Thank you

More Related