EnergyConnect Proposal for Integrating ISONE Price Response Program into Energy Market

EnergyConnect Proposal for Integrating ISONE Price Response Program into Energy Market. John Stremel, Yanchun Wang, and Ted Conway EnergyConnect, Inc. EnergyConnect Proposal Highlights.

menora
Download Presentation

EnergyConnect Proposal for Integrating ISONE Price Response Program into Energy Market

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EnergyConnect Proposal for Integrating ISONE Price Response Program into Energy Market John Stremel, Yanchun Wang, and Ted Conway EnergyConnect, Inc

  2. EnergyConnect Proposal Highlights • There should be some incentives for demand resource to be in energy market besides bill reduction (from load curtailment). • Introducing Penalty for LSEs who have awards for DA Supply Offers but not performed in RT • Penalty $$$$ will go to LSEs who had awards for DA Supply Offers and performed curtailments in real-time. • Not introducing more complexity • No CBL calculation needed • Not to make settlement too complex

  3. Case 1: Only One LSE awarded • No penalty • No credit • Benefit from saving bill for lowering the usage

  4. Case 2: More than one LSEs awarded (1) • Assumptions: • More than one LSE awarded • All awarded LSEs performed load curtailments • The criteria for determining if performing or not • Load schedule – Real-time Usage > 0 • Results • No penalty • No credit • Benefit from lowering bill (load curtailment)

  5. More than 1 LSEs Awarded (2) • Assumptions: • More than one LSE awarded • Some awarded LSEs performed load curtailments, some others not performed load curtailments • The criteria for determining if LSE performing load curtailment or not • Load schedule – RT Usage > 0 • Curtailed MW = Load schedule – RT Usage

  6. More than 1 LSEs Awarded (2) cont. • Penalty • Total non-performed awarded MW X RTLMP • Credit • LSEs who performed curtailments should get additional credits for load reductions • Distribution Ration (for the i-th LSE) = Curtailed MWs for LSEi / Total Curtailed MWs

More Related