PROBLEMS EXPERIENCED AT JATILUHUR DAM, INDONESIA. PROBLEMS EXPERIENCED AT JATILUHUR DAM, INDONESIA. Jatiluhur dam is 105 m high and 1,220m long earth rockfill dam. experienced problems even during its construction. Settled by more than a meter after first filling.

Download Presentation

PROBLEMS EXPERIENCED AT JATILUHUR DAM, INDONESIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROBLEMS EXPERIENCED AT JATILUHUR DAM, INDONESIA

  2. PROBLEMS EXPERIENCED AT JATILUHUR DAM, INDONESIA

  3. Jatiluhur dam is 105 m high and 1,220m long earth rockfill dam

  4. experienced problems even during its construction. Settled by more than a meter after first filling. • Very wide longitudinal cracks (about half kilometer long) appeared at the dam crest during construction stage in early 1965 when dam was partially built to El 103 m. • Sherard and other dam experts reviewed the problem and recommended raising of the dam upto its design crest level of 114.5m • Development of cracks was a recurring problem till ACE carried out remedial works • ACE observed that the upstream slope of the dam, specially in the central highest reach experiences rapid movement on occasions when the reservoir level goes down below El. 90 m. s