An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R2E relocation study in Point 1 TODAY UJ16 UL16 Courtesy A. Tursun, Y. Muttoni

  2. R2E relocation study in Point 1 After relocation area to be reconsidered UJ16 UL16 Courtesy A. Tursun, Y. Muttoni

  3. Current situation in UJ14/16 PC cryo collimation QPS current leads heaters PC control PIC BPM

  4. Racks to be removed from UJ14/16 to be relocated: 15 racks & 2 Power Converters RYSA 03not used anymore , CYCIP 01 merged with DYPG, PC cryogenics (profibus-> moves FIP -> stays) collimation QPS current leads heaters PC spare PIC BPM

  5. Situation in UJ14/16 after relocation PC 4 racks stay Cryo(FIP) QYCO1 QPS RYSA 01 PC spare RYSA 02 PIC BPM

  6. Situation in UL14/16 after relocation RYLC 01 RYLB 01 RYMCB 01-04 RYSC 01 QYC 02 QYC 01 (additional rack) RYCA 01 RYCA 02 DYXA 01 additional rack 2 Power Converters area to be reconsidered DYPG 01 CYCIP 01 DYPG 02 TYCFL 01 Fire detectors “LHC Performance Workshop”, 25 January 2011, A. L. Perrot