R2E relocation study in Point 1. TODAY. UJ16. UL16. Courtesy A. Tursun, Y. Muttoni. R2E relocation study in Point 1. After relocation. area to be reconsidered. UJ16. UL16. Courtesy A. Tursun, Y. Muttoni. Current situation in UJ14/16. PC. cryo. collimation. QPS.
E N D
R2E relocation study in Point 1 TODAY UJ16 UL16 Courtesy A. Tursun, Y. Muttoni
R2E relocation study in Point 1 After relocation area to be reconsidered UJ16 UL16 Courtesy A. Tursun, Y. Muttoni
Current situation in UJ14/16 PC cryo collimation QPS current leads heaters PC control PIC BPM
Racks to be removed from UJ14/16 to be relocated: 15 racks & 2 Power Converters RYSA 03not used anymore , CYCIP 01 merged with DYPG, PC cryogenics (profibus-> moves FIP -> stays) collimation QPS current leads heaters PC spare PIC BPM
Situation in UJ14/16 after relocation PC 4 racks stay Cryo(FIP) QYCO1 QPS RYSA 01 PC spare RYSA 02 PIC BPM
Situation in UL14/16 after relocation RYLC 01 RYLB 01 RYMCB 01-04 RYSC 01 QYC 02 QYC 01 (additional rack) RYCA 01 RYCA 02 DYXA 01 additional rack 2 Power Converters area to be reconsidered DYPG 01 CYCIP 01 DYPG 02 TYCFL 01 Fire detectors “LHC Performance Workshop”, 25 January 2011, A. L. Perrot