1 / 9

Data centre design and build

Advantages of information centre style and build is that it will give for planned house to properly keep the servers in workplace. A planned server space style provides certain adequate place for the servers to be connected with alternative appliances just like the UPS or the routers. Besides,<br>

Download Presentation

Data centre design and build

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mercury PowerBuilding Powerful InfrastructureHangar 9,Redhill AerodromeKings Mill Lane,Redhill,Surrey,RH1 5JYPhone: +44 (0) 1737 821215Email: sales@mercurypower.net

  2. Building Powerful Infrastructure Mercury Power has assembled a seasoned team of industry experts across many disciplines associated with the delivery of mission critical infrastructure. We have industry experts who have worked within & delivered across EMEA many high profile projects for the following disciplines; • Data centre design & build • Structured Cabling UTP / STP and Fibre MM / SM solutions • UPS systems – designed & deployed systems from 10kVA up to 4MVA • DC systems -24v / – 48v 1000w to 400kw systems • Cooling system – innovative high efficiency systems developed & deployed for carrier & defence facilities to drive efficiency. • Battery replacement & maintenance – working with leading carriers & facility operators we have supported many battery replacement projects & implemented a number of battery monitoring solutions.

  3. About Mercury Power has assembled a seasoned team of industry experts across many disciplines associated with the delivery of Mission Critical Infrastructure. We have industry experts who have worked within & delivered many projects for the following disciplines; • Data centre design & build • UPS systems – designed & deployed systems from 10kVA up to 4mVA • Cooling system – innovative high efficiency systems developed & deployed for carrier & defence facilities to drive efficiency. • Free cooling for data centre pod’s • Free cooling for comms rooms • Battery replacement & maintenance – working with leading carriers & facility operators we have supported many battery replacement projects & implemented a number of battery monitoring solutions. • Structured Cabling and Fibre installations

  4. IT Environments At Mercury Power Ltd we pride ourselves on building powerful infrastructure that builds your business. We care about our customers, putting all our attention & drive into delivering you a world class facility. Each member of the team has an extensive and impressive personnel history in the industry, working on some of the largest and cutting edge projects. We are entrusted by some of the largest Global IT, news and trading companies. Adopting in a collaborative can do approach to deliver their solutions.

  5. Data Cable Installation Whether you have a small office requiring a small quantity of additional points or a large office or data center requiring a flood wired Data Cabling solution, we are here to help with data cable installation. We offer a full range of solutions all backed with a product 25 year Structured Cabling factory backed warranty. Data Cable Installation Budget Solution: Solution for small companies with tighter budgets, starting from £25 per tested and certified point, based on an average of 40m cable runs utilising existing containment. For solutions of 500 points or more, we will free issue the Patch panel cabinet.

  6. Standby Generators Mercury Power have a dedicated division with unparalleled experience in the design, deployment and maintenance of standby generators throughout Europe. Its design, implementation and maintenance team leaders have many years experience, most from their training with the British Armed Forces prior to the civilian arena. The team offer permanent or a field based temporary systems, ranging from small domestic 5 KVA units right through to industrial multiple 1 MVA systems.

  7. Another Successful generator installation at Gatton Manor Golf and Spa club The Mercury Power team have successfully installed a new generator at Gatton Manor Golf and Spa club

  8. Contact Us MERCURY POWER LTD Hangar 9 Redhill Aerodrome Kings Mill Lane Redhill Surrey RH1 5JY Phone: +44 (0) 1737 821215 Email:sales@mercurypower.net

More Related