Navitus Bay Wind Park. South West Waste Management Group 13 th June 2012 Rebecca Evans – Project Developer Jeff Turner – Development Consultant. Navitus Bay Development Limited (NBDL) is a joint venture between Eneco and EDF Energy created to develop the Navitus Bay Wind Park.

merrill
Download Presentation

Navitus Bay Wind Park

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Navitus Bay Wind Park South West Waste Management Group 13th June 2012 Rebecca Evans – Project Developer Jeff Turner – Development Consultant

  2. Navitus Bay Development Limited (NBDL) is a joint venture between Eneco and EDF Energy created to develop the Navitus Bay Wind Park. Eneco is a Dutch utility owned by 60 municipalities with over 2 million customers in the Netherlands. The company has a strong focus on sustainable generation with interests in onshore and offshore wind, solar, hydro and geothermal EDF Energy is the UK subsidiary of EDF, with over 5 million customers in the UK. EDF Energy have 20 onshore wind farms in operation and are currently constructing the Teesside Offshore Wind Farm, due for completion at the end of 2012. Who are we? 2 2

  3. The Crown Estate – Round 3 • Offshore Wind is key to the Government’s targets for renewable energy generation • The Crown Estate announced 9 sites for development in 2008. • Eneco was awarded Zone 7 in January 2010. • 32 GW have been identified from Offshore Wind by 2020. • If realised, would meet 25% of UK demand 3

  4. Project Development Area Overview Site chosen after a zone appraisal and planning (ZAP) process in accordance with guidance from The Crown Estate – constraints mapping 76 square miles At least 900MW, up to 1200MW Average water depths 30-50m

  5. Distances from shore

  6. Zone Appraisal Studies Environmental Data Gap Analysis Seascape and visual impact study Commercial Fisheries Shipping and Navigation Benthic Habitat Study Archaeological Study Aviation and Mod Study Ornithology Metocean Study Geological Modelling UXO Studies Wind Resource Assessment Trenching Assessment Foundation and turbine concept study 5

  7. Offshore wind turbines • Turbines up to 210m height • Blade span of up to 170m • Up to 55m depth • Foundations required to be piled into the seabed 7

  8. Onshore Works – cable route & substation Grid Connection at Mannington (north of Bournemouth) Cable corridor identified using environmental, engineering and landowner constraints Two substation options consulted on near to Mannington

  9. Cable corridor

  10. Planning process New planning regime in place for ‘Nationally Significant Infrastructure Projects’ under The Planning Act 2008 NBDL will submit a Development Consent Order (DCO) incorporating the required consents including, if required, compulsory purchase Planning Inspectorate (PINS) will examine the application and will make a recommendation to the relevant Secretary of State, who will make the decision on whether to grant or to refuse development consent 10

  11. Where we are up to Development Consent Order Strategic Proposals ZAP EIA Formal public consultation Current position Changes to the Development Area Development Area Informal public and stakeholder consultation Formal stakeholder consultation

  12. High Level Project Schedule Environmental Impact Assessment (EIA) Scoping Report completed September 2011 Offshore Works 2012: Geophysical survey, Borehole for Met Mast, Met Mast installation (subject to license) The Development Consent Order (DCO) Application to IPC end of 2013. Consent decision expected end of 2014 / Q1 2015 Financial Close / Construction Contracts to be awarded in 2016 Construction Proposed to commence 2016 Operational Wind Park 2019 / 2020 12

  13. Any Questions?