1 / 36

INTERNATIONAL CONGRESS “ENERGY DAY ”

Join us in July 2012 to explore the progress and vision for private sector hydrocarbon production development worldwide. Discover new exploration techniques, technological advancements, and investment opportunities in key basins like Ucayali, Ene, and Madre de Dios. Learn about seismic visualization, integrated geological models, and smart fields integration for mature fields optimization.

mgooding
Download Presentation

INTERNATIONAL CONGRESS “ENERGY DAY ”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERNATIONAL CONGRESS “ENERGY DAY” EXPLORATION PROGRESS AND HYDROCARBON PRODUCTION DEVELOPMENT PRIVATE SECTOR VISION PEDRO GRIJALBA JULY 2012

  2. EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

  3. 39 1AB 64 Z-1 8 57 56 88 58 GAS – CONDENSATE OIL LOTS CONTRACTS COLOMBIA ECUADOR PERU BASIN DISTRIBUTION MAP TUMBES MARAÑON TALARA GAS – CONDENSATE - OIL BRASIL SECHURA UCAYALI PACIFIC OCEAN MADRE DE DIOS ENE PISCO CANDAMO BOLIVIA CHILE JULY

  4. EXPLORATION DISCOVERED RESERVES POTENTIAL RESOURCES BASINS UCAYALI– ENE– MADRE DE DIOS CERTIFICATED RESERVES 11 TCF & 611 MMBLS POTENTIAL RESOURCES 50 TCF & 2700 MMBLS UCAYALI ENE MADRE DE DIOS DEVELOPED GAS UNDEVELOPED GAS PROSPECTS

  5. WORLDWIDE JULY

  6. EXPLORATIONPROGRESS - WORLDWIDE 2000’s: Horizontal Tomography between wells / Wireless Seismic 1990’s: 4D Seismic/ Neural Networks 1980’s: 3D Seismic/ Imaging Technology 1970’s: Seismic stratigraphy / VSP 1960’s: Synthetic seismograms / Vibrator Trucks JULY

  7. SEISMIC RECORD WHILE DRILLING BASIN PROGRESS VISUALIZATION SEISMIC FACIES EXPLORATIONPROGRESS - WORLDWIDE JULY

  8. SMART FIELDS INTEGRATION DIGITAL CONNECTION OF OILFIELDS MULTILATERAL WELLS APPLICATION TECHNOLOGY IMPROVED RECOVERY TECHNOLOGY APPLICATION NEW CONCEPTS AND MODELS FOR MATURE FIELDS INTEGRATED GEOLOGICAL MODELS FOR MATURE FIELDS GEOSCIENCES RESERVOIR MANAGEMENT TO OPTIMIZE MATURE FIELDS NEW PRODUCTIONDEVELOPMENT - WORLWIDE JULY

  9. Source: BP Statistical JULY

  10. Source: BP Statistical JULY

  11. PERU JULY

  12. TOTAL 2D SEISMIC PERIOD 2002-2011 222 km TOTAL 3D SEISMIC PERIOD 2002-2011 2,712 km2 EXPLORATIONPROGRESS - PERU EXPLOITATION AREAS – PERU 2D SEISMIC (km) – Period 2002-2011 EXPLOITATION AREAS – PERU 3D SEISMIC (km2) – Period 2002-2011 SOURCE: PERUPETRO - MINEM JULY

  13. TOTAL 2D SEISMIC PERIOD 2002-2011 38,169 km TOTAL 3D SEISMIC PERIOD 2002-2011 14,518 km2 EXPLORATIONPROGRESS - PERU AREAS IN EXPLOITATION – PERU 2D SEISMIC (km) – Betweentheyear 2002 to 2011 EXPLORATION AREAS – PERU 2D SEISMIC (km) – Period 2002-2011 AREAS IN EXPLORATION – PERU 3D SEISMIC (km2) – Period 2002-2011 SOURCE: PERUPETRO - MINEM JULY

  14. EXPLORATIONPROGRESS - PERU EXPLORATORY DRILLING PROGRESS ExploratoryWells FOREST SOURCE: PERUPETRO - MINEM JULY

  15. EXPLORATIONPROGRESS - PERU RATIO: 2D Seismic and Exploratory Wells for exploration contracts km/contract Wells/contract Kms / contract Wells / contract SOURCE: PERUPETRO - MINEM JULY

  16. Magazine Zona Petrolera January 2011 Venture capital attraction constitutes a fairly complex and huge process EXPLORATIONPROGRESS - PERU DISCOVERIES AND IMPLEMENTATIONS Discoveries charts Accumulations Discoveries Implementations SOURCE: PERUPETRO - MINEM JULY

  17. IINVESTMENT TOTAL PERIOD 2002-2011 USD 6,469 MM INVESTMENT TOTAL PERIOD 2002-2011 USD 2,754 MM EXPLORATIONPROGRESS - PERU EXPLOITATION INVESTMENTS – PERU Period 2002 - 2011 EXPLORATION INVESTMENTS – PERU Period 2002 - 2011 SOURCE: PERUPETRO - MINEM JULY

  18. EXPLORATIONPROGRESS - PERU “INVESTMENT / No. CONTRACTS” PROGESS Contract Exploitation Exploration YEAR 2011 CURRENT EXPLOITATION CONTRACTS : 20 CURRENT EXPLORATION CONTRACT : 62 TOTAL CURRENT CONTRACTS: 82 YEAR 2011 No. OF LOTS WHERE INVESTMENTS WERE MADE OVER USD 50 MM, IN EXPLOITATION: 04 OVER USD 10 MM, IN EXPLORATION: 12 SOURCE: PERUPETRO - MINEM JULY

  19. EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

  20. OIL PRODUCTION IN LOT X WAS DOUBLED NEW PRODUCTIONDEVELOPMENT - PERU PRODUCTION OF LOT X New Old JULY

  21. NEW PRODUCTIONDEVELOPMENT - PERU OIL PRODUCTION (NORTHWEST) + than 22,000 b/d IN 8 YEARS, PRODUCTION WAS DOUBLED JULY

  22. NEW PRODUCTIONDEVELOPMENT - PERU TOTAL PERU SUPERVISED GAS PRODUCTION JULY

  23. EXPLORATION PROGRESS NEW PRODUCTION DEVELOPMENT AGENDA PRIVATE SECTOR VISION JULY

  24. NO INVESTMENT, NO NEW PRODUCTION RELATION BETWEEN NEW PRODUCTION – INVESTMENT AND DRILLING - NORTHWEST Wells and USD MM BLS/year PRODUCTION DRILLED WELLS INVESTMENT JULY

  25. INVESTMENT AND OBJECTIVES CONSERVATIVE SCENARIO OPTIMIST SCENARIO Source: Strategic Plan of Sustainable Energy and Strategic Environmental Assessment, as planning instruments– MEF-MINEM-BID / 2012 JULY

  26. INVESTMENT AND OBJECTIVES GDP Optimist Pesimist SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

  27. HYDROCARBONS TRADE BALANCE BACKGROUND AND STRATEGIC PLAN INVESTMENT AND OBJECTIVES SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

  28. INCREMENTAL SUPPLY PROGRESS ACCORDING TO EXPLORATORY PLAN (MMSCFD) OPTIMIST SUPPLY OF ADJACENT LOTS (NEW EXPLORATION) BASE SUPPLY OF ADJACENT LOTS (NEW EXPLORATION) SUPPLY OF BATCHES 88+56+57+58 (ONGOING EXPLORATION) SUPPLY OF LOTS 88+56+57 (NO EXPLORATION) INVESTMENT AND OBJECTIVES SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

  29. INVESTMENT AND OBJECTIVES INVERSION Y OBJETIVOS Chart R.E.16: CAPEX + OPEX of Gas Plan Chart R.E.14: Exploration Program of Camisea Gas CURRENT VALUE SOURCE: STRATEGIC PLAN OF SUSTAINABLE ENERGY AND STRATEGIC ENVIRONMENTAL ASSESSMENT, AS PLANNING INSTRUMENTS– MEF-MINEM-BID / 2012 JULY

  30. E&PPROJECTS – LONG TERM AND RISK RECOVERY GROWTH – MATURE FIELDS IN PERU, MORE THAN 90% OF OIL PRODUCTION COMES FROM MATURE FIELDS. IT IS IMPORTANT TO PLAN STRATEGICALLY TO INCREASE THE RECOVERY FACTOR FROM 15% TO 35%. IT IS NECESSARY TO EVALUATE (ECONOMIES OF SCALE) THE IMPLEMENTATION OF WELL PROJECTS "INFILL“, DEEP WELLS, HYDRAULIC FRACTURING OF DEEP PENETRATION AND MASSIVE, NEW POTENTIAL HORIZONS, FLUID INJECTION, EQUIPMENT DESIGN AND TOOLS MORE EFFICIENT AND LOW COST. WITHIN 8 YEARS (2004-2011), OIL PRODUCTION NORTHWEST HAS ACHIEVED DOUBLE. CAN WE TRIPLE OIL PRODUCTION? IN HOW MANY YEARS? IT IS POSSIBLE ONLY WITH STRATEGIC PLANNING OF PRIVATE SECTOR OR STATE PLANNING IS REQUIRED? VISION: COMBINED WITH STRATEGIC PLANNING COMPANY - STATE (LONG TERM), INVESTMENT AND TECHNOLOGY, IT IS POSSIBLE TO TRIPLE OIL PRODUCTION. JULY

  31. PROJECTS E&P – LONG TERM Y RISK NEW PRODUCTION – NEW FIELDS PERU, REQUIRES IMPLEMENTING / EXECUTING NEW PROJECTS FOR DEVELOPMENT AND PRODUCTION OF OIL AND GAS. IT IS IMPORTANT THAT THE DISCOVERED GAS HAS BEEN MONETIZED FOR THE WELFARE SOCIETY AND BUSINESSES. NATURAL GAS DOMESTIC MARKET CONSUMPTION GROWS AT A RATE OF 23%, AND IT IS NECESSARY TO MAINTAIN A RATIO RESERVES/ MINIMUM CONSUMPTION OF 20. THE TOTAL CONSUMPTION IN THE COUNTRY IS APPROX. 0.4 TCF PER YEAR (YEAR 2011). IT IS NECESSARY TO CARRY OUT EXPLORATION EFFORTS FOR GAS AND OIL. WITHIN 8 YEARS (JUN 2004 – MAY 2012), PROVED NATURAL GAS RESERVES HAS BEEN CONSUMED 1.3 TCF. CAN WE INCREASE PROVED RESERVES OF NATURAL GAS AND OIL? IN HOW MANY YEARS? IS IT POSSIBLE ONLY WITH STRATEGIC PLANNING OF PRIVATE SECTOR OR STATE PLANNING IS REQUIRED? VISION: COMBINED WITH STRATEGIC PLANNING COMPANY - STATE (LONG TERM), INVESTMENT AND TECHNOLOGY, IT IS POSSIBLE TO INCREASE NATURAL GAS AND OIL RESERVES JULY

  32. SOCIAL AND ENVIRONMENTAL RESPONSABILITY GROWTH PILLARS OF BUSINESS STRATEGY SUSTAINABLE DEVELOPMENT PROFITABILITY JULY

  33. INVESTMENT INFRASTRUCTURE EFFICIENT STATUS ON TIME PERMITS INTER-RELATION BETWEEN PRIVATE AND DOMESTIC SECTOR ENERGY – ROYALTIES - CANON DEVELOPMENT - SUSTEINABILITY JULY

  34. STRATEGIC BUSINESS DRIVERS DISCOVER RESERVES / RESOURCES INCREASE OIL AND GAS RECOVERY JULY

  35. CHALLENGES OPPORTUNITIES HUMAN RESOURCES, INFRASTRUCTURE AND LOGISTICS, AVAILABILITY OF INVESTMENTS, DOMESTIC INDUSTRY COMPETITIVENESS, COST OPTIMIZATION APPROVALS “JUST IN TIME” ECONOMIC GROWTH, MARKET GROWTH, ATTRACTIVENESS TO OTHER COMPANIES, ENHANCEMENT OF RESOURCES, INFRASTRUCTURE GROWTH HIGHER PRODUCTION AND ROYALTIES. CHALLENGES AND OPPORTUNITIES – LONG TERM GROWTH JULY

  36. THANK YOU JULY

More Related