An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS Week/FAC24-28 October, 2005Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status

  2. Major Effort Areas • Naming and counting all devices • Block diagrams of entire system • Aligning XTOD controls hardware with LCLS global standards • Completing cost+schedule • Installing EPICS and PLC software at LLNL

  3. Naming/Counting Devices • Comprehensive spread-sheet is complete • LCLS-conformant names selected • Full “chain” enumerated: devicegcablegcontroller/PLCgcablegIOC • Equipment costs tallied • Effort costs tallied: Mgmt + EDI + unit • Block Diagrams are complete • Also matches mechanical layout

  4. Cost Summary =5 FTEs

  5. LCLS Global Standards… • Motors: • Newport XPS single-box: turnkey; TCP/IP field-bus; driver and motor record from APS • Cannot “set position”; may need alternate for powerful motors • Cameras: • Camlink compatible from SLAC • IOCs: • VME/6100 when EVR required • ‘Small’ IOC? Want RTEMS+EPICS+drivers+‘breakout’ engineering

  6. LCLS Global Standards… • Vacuum • Choices for Gauges • MKS-937A w/317-CEP and 422-CCG • 15msec response option • Choices for Ion Pumps • MPS-2 • SafeCONN w/StarCell • PLC: Allen-Bradley • CLX-5000 for processor • Flex-I/O for distributed I/O • EtherIP+serial from SNS

  7. G G P V C C O • Operator uses portable console • Gauge/controller read-outs available • Optional valve panel • PLC provides both single-sector and global control • Analog wiring to devices • Delegate to smart gauge controller • EPICS uses Ethernet/IP for full access • Star-wiring to switches • Additonal serial path for more details • EPICS “master” sequencing available <=Hardware-to-PLC: analog PLC I/O <=PLC-to-IOC & PLC-to-PLC: Ethernet/IP Controller-to-IOC: Serial=> IOC <=IOC-to-OPI: Ethernet/CA

  8. EPICS at LLNL • 2 Linux servers operational • Working w/SLAC group on clean build • PLC Software w/PC in house • Will install soon • FY06 • Prototype Gas Attenuator and Vacuum • Prototype Motors, Cameras, and IOCs • R&D on Diagnostics

  9. EPICS at LLNL • FY07 • Procure all H/W • Configure EPICS • Design Diagnostics • FY08 • Complete Diagnostics • Commission