1. PDO NORM Management System Brett Young
2. Specification SP 1170 Version .3.0
Defines responsibilities
Est. Dose limits
Inc. NORM Radiological Surveys into the PTW
Training
Transport and Storage Locations
Emergency Procedures
Incorporates NORM Management Guidelines
3. SP 1170 PDO Policy
Plant that has conveyed or stored production fluids (water/oil) or gas are potentially NORM contaminated.
Dose Limits
1 mSv/year for PDO workers & contractors
NORM Guideline CSM.001 provides guidance on action limits
Inhalation / Ingestions Limits
5 cps above background - PPE
4. NORM Management Guidelines Based on Syrian Guidelines
How to.. guidelines
Inc. NRS in PTW for consistency of approach
Added flow charts for specific activities
Modified to include PDOs meters
5. HEMP - Permit To Work Production oil/gas/water - conveyed/stored
Trips PTW which requires a NORM Radiological Survey (NRS)
Measurements conducted by RPT
Recorded and attached to PTW
NRS stipulates controls
e.g. PPE, Supervised/Controlled Areas.