WSO/UV MOC and SOC Technical Definition Decisions to be made

WSO/UV MOC and SOC Technical Definition Decisions to be made. GMV, S.A c/ Isaac Newton 11 P.T.M. - Tres Cantos E-28760 MADRID Spain. WSO Starting point. WSO – MOC/SOC scenario. Spanish industry contributing to the G/S definition as far as current data allows.

Download Presentation

WSO/UV MOC and SOC Technical Definition Decisions to be made

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WSO/UV MOC and SOC Technical DefinitionDecisions to be made GMV, S.A c/ Isaac Newton 11 P.T.M. - Tres Cantos E-28760 MADRID Spain

  2. WSO Starting point WSO – MOC/SOC scenario • Spanish industry contributing to the G/S definition as far as current data allows. • CDTI/Roscosmos meeting on 23th-May-06 • CDTI wants to support WSO activities • MOC/SOC definition require some decisions to be made before the next steps are accomplished. Page 2

  3. MOC Definition MOC – Subsystems and Functionalities • MOC components, • WMCS (WSO Mission Control System) , including • TM/TC processing, Time Correlation, OBSW maintenance, FDS data provision, Trend Analysis, Flight Operations Plan, DB maintenance tools, Mission Planning (Phase II),... • Other Systems, • FDS, OBSM, Data Transmission, Data Distribution, Simulators,… Page 3

  4. WMCS Open Points WMCS – major items TBC/TBD • Single-Backup/Distributed/Multiple MOCs ? • Cruise Phase / Routine Phase: same MOC ? • Base Technology (S2K,…) ? • Both/Only Secondary/Only Routine Phase Primary • Only one MOC commands the s/c at time. • Every MOC should be commanding qualified, by means of a Master pre-planned schedule file or by means of R/T commanding. • Critical Operations limited to primary MOC. • Costs / Risks / Development Calendars / Political / Infraestructure issues. Page 4

  5. SOC Definition SOC – Subsystems and Functionalities • SOC Components, • WSCS (WSO Science Control System) includes, • WSCS Systems: Instruments Monitoring and Control, Proposal Handling, Mission Planning (Phase I), Preliminar Data Processing, Quick Look Analysis, Archiving, Data Transmission, Data Distribution, … • WSCS Functionalities: Instrument Control and Analysis, Mode definition and exploitation, Observation Planning and Operations, ToOs, ...... • SOC may include/share/exclude… • Pipeline, Final Scientific Archive, ... Page 5

  6. WSCS Open Points WSCS- Major items TBD/TBC • SOC/WSCS distributed architecture ? • Architecture, and i/f depend on this issue. • Single or multiple SOCs • Cruise Phase will require a minimum SOC? • Base technology (S2K, …) • Both/Only Secondary/Only Routine Phase Primary ? • SOC/WSCS, • May be developed in combination with the WMCS • Progressive Implementation. • Costs / Risks / Development Calendars / Political / Infraestructure issues. Page 6

  7. WSO End points So... WMCS-WSCS, decisions to be made • MOC(s) role within the G/S • Single/Distributed/Multiple. • Base Technology for them. • Internal/external interfaces may be affected. • SOC(s) role within the G/S • Single/Distributed/Multiple. • Base Technology for them. • Internal/external interfaces may be affected. • Standards to follow. Mission Phases dependencies. • Usage of existing products ? Page 7

  8. GMV GMV- Major provider in MCS/SCS • GMV is a spanish privately-owned company devoted to engineering and software development for the aerospace market (http://www.gmv.com) • MOC and SOC experience with Agencies and Commercial operators, • MCSs: S2K 4.0, Cryosat/GOCE MCS, Galileo GSTB MCS, Astra, Eutelsat, ... • SCSs: SMOS, COROT, XMM-Newton (this was a combined MCS/SCS development for a distributed G/S mission). • Generic Own products line, • HiFly MCS (http://www.hiflycontrol.com) • focusSuite FDS (http://www.focussuite.com) • flexPlan MP (http://www.flexplan.com) Page 8