Process Analysis, Kristen’s Cookies & Mapping.

Process Analysis, Kristen’s Cookies & Mapping. Week 2. Today’s Agenda. Continuing with Process Analysis Kristen’s Cookies Case Variability Issues Process Mapping Mapping Team Exercise. KRISTEN’S COOKIES Case. Applying what you’ve learned so far…. Another Example: Quick Service Insurance.

micol
Download Presentation

Process Analysis, Kristen’s Cookies & Mapping.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Analysis, Kristen’sCookies & Mapping. Week 2

  2. Today’s Agenda • Continuing with Process Analysis • Kristen’s Cookies Case • Variability Issues • Process Mapping • Mapping Team Exercise

  3. KRISTEN’S COOKIESCase Applying what you’ve learned so far…

  4. Another Example:Quick Service Insurance • Process times per order: Underwriting→ Rating→ Policy Issuing ( 50 min) (60 min) (10 minute)

  5. 2 underwriters and 3 Raters Rating underwriting Rating Policy Underwriting Rating Cycle Time? Throughput rate?

  6. 5 pm, at 100% capacity (5000 vehicle-miles/hr) Renton to Seattle Tput time: 120 minutes Process time capacity and throughput time

  7. 5 pm, at 100% capacity (5000 vehicle-miles/hr) Renton to Seattle Tput time: 120 minutes 5 am, at 10% capacity (500 vehicle-miles/hr) Renton to Seattle min Tput time: 2 minutes Process capacity and Tput time

  8. 5 pm, at 100% capacity (5000 vehicle-miles/hr) Bellevue to Seattle cycle time: 120 minutes 5 am, at 10% capacity (500 vehicle-miles/hr) Bellevue to Seattle cycle time: 5 minutes Process capacity and Tput time For constrained processes, Time worsens non-linearly with Capacity Utilization Tput Time Capacity Utilization

  9. 2 = 1% Capacity challenge, unevenness, Tput time Mean Tput Time 0 60 110 10 20 30 40 50 70 80 90 100 Mean Capacity Demanded, percent of available

  10. 2 = 1% 2 = 5% Capacity challenge, unevenness, Tput time Mean Tput Time 0 60 110 10 20 30 40 50 70 80 90 100 Mean Capacity Demanded, percent of available

  11. 2 = 1% 2 = 5% 2 = 10% Mean Tput Time 0 60 110 10 20 30 40 50 70 80 90 100 Mean Capacity Demanded, percent of available Capacity challenge, unevenness, Tput time

  12. Note: • In the Manzana Insurance case for next time, the level of variability at each step should be considered.

  13. Summary • Process Concepts & Terminology • Demonstrations of concepts • Analytical Tools • All ideas will be applied in the Manzana case