1 / 19

PRESENTATION on COMPLETION of IRRIGATION PROJECTS

PRESENTATION on COMPLETION of IRRIGATION PROJECTS. CATEGORISATION OF IRRIGATION PROJECTS. Major Project : CCA > 10,000 ha Medium project : CCA > 2,000 but < 10000 ha Minor Project : CCA < 2,000 ha. IRRIGATION POTENTIAL (M. ha).

mignon
Download Presentation

PRESENTATION on COMPLETION of IRRIGATION PROJECTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION on COMPLETION of IRRIGATION PROJECTS

  2. CATEGORISATION OF IRRIGATION PROJECTS • Major Project : CCA > 10,000 ha • Medium project : CCA > 2,000 but < 10000 ha • Minor Project : CCA < 2,000 ha

  3. IRRIGATION POTENTIAL (M. ha)

  4. IRRIGATION DEVELOPMENT 1951 2001 • Irrigation Potential(M.ha) 22.6 94 (9th Plan) • Projects completed(No.) 217 1119 (9th Plan) • Population(M.) 361 1027 • Food Production(M.T.) 51 211

  5. PROJECTS OF TENTH PLAN

  6. ONGOING PROJECTS Major Projects Total potential to be created on completion - 15.462 Mha Estimated cost for completion - Rs.1,74,987 crore Medium Projects Total potential to be created on completion - 1.082 Mha Estimated cost for completion - Rs.16,062 crore

  7. MINOR IRRIGATION Minor irrigation schemes (both surface and ground water) taken up by State Governments under their own programme Achievements in first two years of X Plan period indicate creation of 0.7 Mha per year

  8. GAP IN POTENTIAL CREATED AND UTILIZED Gap between potential created – 14 M ha and utilized Need for measures to close the gap

  9. TENTH PLAN TARGET MAJOR AND MEDIUM OUTLAY - Rs. 70,862 crore POTENTIAL - 6.5 million hectare MINOR OUTLAY - Rs. 13,873 crore POTENTIAL - 4.00 million hectare

  10. ACCELERATED IRRIGATION BENEIFTS PROGRAMME (AIBP) Accelerate implementation of ongoing irrigation projects Provide financial assistance to States for completion of projects in advanced stage Commenced in 1996-97 after Cabinet’s Approval on 30-10-1996

  11. AIBP (contd..) • CRITERIA • Projects costing more than Rs.500 crore in advanced stage of completion • Inclusion of another project considered on completion of one project • Assistance to large projects for phased completion • Priority to projects on which more than 50% cost incurred • Priority for inclusion in the programme • Projects benefitting Tribal/drought prone areas • Inter-State Projects • Projects with larger irrigated area per unit of additional investment

  12. AIBP(contd..) CRITERIA Projects having investment clearance from Planning Commission Only Grant Component released by the Centre Loan Component of the Assistance to be raised by the States themselves State Governments to enter into MoU for each project indicating balance cost, year-wise phasing of expenditure, balance potential and target completion date

  13. AIBP(contd..) • KBK districts of Orissa to be treated at par with special category States • MI Schemes with potential more than 100 hectares in non-Special Category States with preference to drought prone and tribal areas which wholly benefit dalits and adivasis to be treated at par with Special Category States for funding. Such areas to be identified in consultation with the Planning Commission • Surface minor irrigation schemes (both new and on-going) of special category States and KBK districts covered under the Programme

  14. AIBP(contd..) • ERM projects can be included subject to certain conditions • Reforming State - the State to revise water rates to meet full O&M costs at the end of fifth year • Categorized Reforming States – Andhra Pradesh, Gujarat, Jharkhand, Madhya Pradesh, Maharashtra, Orissa and Rajasthan

  15. AIBP(contd..) Completion of projects under normal Programme in four financial years Approved projects which can be completed in two financial years can be posed under FTP Assistance under FTP would be 1:0 (Centre:State)

  16. AIBP(contd..) • CA to Reforming States in special category and KBK districts/tribal/flood/drought prone areas in full • CA to Reforming States in non-special category in the ratio of 4:1 (Centre:State) • CA to non-Reforming States in non-special category in the ratio of 2:1 • CA to non-Reforming states in the special category in the ratio of 3:1

  17. AIBP (contd..) • CLA/Grant Released Amount (Rs. crore) Upto end of IX Plan 8480.029 2002-2003 3061.703 2003-2004 3128.501 2004-2005 2867.337 2005-2006 (upto 1/2006) 840.439 (Grant) TOTAL 18378.009

  18. AIBP (contd..) • Physical Achievements • Major/Medium Irrigation Projects Total No. of projects 191 Target potential 7.99 million hectare Potential created before AIBP 6.6 million hectare Potential created with AIBP (Mar ’05) 3.2 million hectare Number of Projects Completed 47 • Surface Water Minor Irrigation (MI) Schemes Included 4479 Completed 3179

  19. THANK YOU

More Related