HYSPEC Instrument: Status and Performance

HYSPEC Instrument: Status and Performance. M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed Matter Physics & Materials Science, Brookhaven National Lab. Instrument Performance by Phase. Control Cabin. External Building.

mihaly
Download Presentation

HYSPEC Instrument: Status and Performance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HYSPEC Instrument:Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed Matter Physics & Materials Science, Brookhaven National Lab.

  2. Instrument Performance by Phase

  3. Control Cabin External Building Shutter HDCShielding Chopper Box B CVI Curved Beam Guide Chopper Box A Concrete Shielding Detector Vessel Drum Shield Sample Overview

  4. External building Share common foundationslab with BL13 (FnPB)Year 1 – Foundation slab+ HYSPEC buildingYear 2 – FnPB buildingHYSPEC specificationsare done.FnPB specifications arealmost done.A&E bids in July/August.

  5. Drum Shield Polarization Analyzer or Radial Collimator Sample Focusing Crystals (inside) Detector Vessel Sample Stage

  6. Polarizing (Heusler) Ordered 33 crystals from ILLFirst 11 in December 2008Second 11 in June 2009Final 11 in December 2009 Non-polarizing

  7. IDT Executive Committee Meeting 2nd April 2007, CNMS, ORNL Peter Allenspach (PSI), Rob McQueeney (Ames/Iowa), Jim Rhyne (LANL),Steve Shapiro (BNL), Igor Zaliznyak (BNL) SING Schedule Engineering design Buildings Procurements Polarization – mirrors & 3He

  8. Summary • Design is continuing Completed = primary beamline (choppers, guides, shielding) Current = drum shield system Future = sample stage, detector vessel, 3He polarization analyzer • Procurements = CVI, BSI, T0 chopper, Heusler crystals, (A&E drawings for building) • Installed = CVI, BSI, 6-15m poured in place