1 / 5

KEK (+ UniGe ) Status

KEK (+ UniGe ) Status. Y. Unno et al. Double-side modules. Leakage current after SB assembly. (*) ) later identified due to “no wire” wire-bonding, i.e., wedge hit sensor. Revised new jig (of KEK). Vacuum chuck with uniformly spaced vacuum holes, a la “SCT barrel module assembly jig”

mikaia
Download Presentation

KEK (+ UniGe ) Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEK (+ UniGe) Status Y. Unno et al.

  2. Double-side modules

  3. Leakage current after SB assembly (*) )later identified due to “no wire” wire-bonding, i.e., wedge hit sensor.

  4. Revised new jig (of KEK) • Vacuum chuck with uniformly spaced vacuum holes, a la “SCT barrel module assembly jig” • Sorry, no photo yet Before assembly (HPK) Before assembly (HPK) After SB assembly After SB assembly Back-side Front-side

  5. Summary • KEK is required to provide 4 double-side modules to the super-module program. • Two are under fabrication, through very slow steps (wire-bonding debugging, assembly jig debugging, …) • Prospect: up to 4 would be completed by mid. Oct. • The revised new jig seems promising against the damage to the sensor in the SB assembly. • Need to watch out, yet.

More Related