1 / 5

Validation Campaign for Lidar Deployment at TMF Locations

Discussing the strategic deployment of lidar systems at TMF locations for atmospheric validation campaigns. Sync suggestions and alternate schemes are detailed for enhanced data collection.

Download Presentation

Validation Campaign for Lidar Deployment at TMF Locations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TALKING ABOUT VALIDATION CAMPAIGN…TOLNET DEPLOYMENT AT TMF TM-2¼ mile away TMF H2O lidar TOPAZlidar TROPOZlidar TMF O3 lidars LMOLlidar Balloonlauncharea ATlidar

  2. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) NortheastHigh Desert(elev. 4000 ft)

  3. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) SoutheastSan Bernardino(urban)

  4. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) South: LA Basinbehind “blue ridge”

  5. LASERS SYNC SUGGESTION At TM-2: TOPAZ 1 kHz  /20  50 Hz to TROPOZ At TM-21: LMOL 1 kHz  /33  30 Hz to JPL AT (50 Hz)  /5  to H2O lidar NO SYNC NEEDED BETWEEN TM-2 AND TM-21(1/4 MILE DISTANCE) ALTERNATE SCHEME: At TM-2: TOPAZ and LMOL 1 kHz , TOPAZ tilted At TM-21: TROPOZ 50 Hz  /3  150 Hz  /5  30 Hz to JPL

More Related