1 / 52

Severity 4 & 5 observations May ’2010 West Region

Severity 4 & 5 observations May ’2010 West Region. Severity 5- Damaged rope Ladder was being used for access to roof (Sun pharma) _West Action Taken: Rope Ladder removed from site & Scaffolding arranged.

miles
Download Presentation

Severity 4 & 5 observations May ’2010 West Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Severity 4 & 5 observations May ’2010 West Region

  2. Severity 5- Damaged rope Ladder was being used for access to roof (Sun pharma) _West Action Taken: Rope Ladder removed from site & Scaffolding arranged .

  3. Severity 5- Sheeters were ascending & descending w/o anchoring lanyard (Sun Pharma) _West Action Taken: Stopped activity &. Explained importance of anchoring ,Training given to all workers .

  4. Severity 4- Oxygen & L.P.G. Cylinder without Flash Back Arrestor, Fire Extinguisher, & Barricading & trolley. (Jindal Rail) _West Action Taken: Work was stopped and asked builder to provide flash back arrestor and trolley for cylinder

  5. Severity 4- Life Line found damage.(Jindal Rail) _West Action Taken: Life line replaced.

  6. Before After Severity 4- Compressor without Guard , Barricading, Fire Extinguisher & Emergency cut off Switch. (Jindal Rail) _West Action Taken: Compressor replaced with New one. .

  7. Severity 4- Painter Helper without Life Line. (Jindal Rail) _West Action Taken: Work Stopped & Life Line Provided. .

  8. Before After Severity 5- Workers found sitting on purlin for secondary work. (Jindal Rail) _West Action Taken: Stopped work, Provided life line with Sag angle platform. .

  9. Severity 4- Extra Fiber & MR-24 Sheets found loose on Roof. (Arshiya) _West Action Taken: Extra Sheet removed from Roof.

  10. Severity 5- Sheeters working with out full body harness & life line at Eve End. (Arshiya)_West Action Taken: Work was stopped and full body safety harness provided and life line .

  11. Severity 5- Hydra safety Latch & sling found damage. (Grasim Wada)_West Action Taken: Safety latch repaired & damaged sling discarded. .

  12. Severity 5- Electrical Board & wire laying on ground w/o proper Stand. (KD. Logistics,)_West Action Taken: Electrical Board rectified. .

  13. Severity 5- Riggers Sitting & anchoring safety belt on girt (Unique Delta) _West Action Taken: Work Stopped and asked builder to mobilize proper scaffolding . .

  14. Severity 4- Rope ladders were being used as access & also in damaged condition (Unique Delta) _West Action Taken: Work Stopped and all rope ladders were removed from site, Issued warning to builder & asked builder to mobilize Mobile scaffold for same work (Action taken). .

  15. Severity 4- Scaffold Wheel found w/o wheel Lock. (Unique Delta) _West Action Taken: Work Stopped and scaffolding with wheel lock arrangement provided

  16. Severity 4- Compressor Electrical Box found open.(Unique Delta) _West Action Taken: Work Stopped and asked builder to rectify .

  17. Severity 4- Main Board RRCB found Bypass , naked wires, Starter without cover (Unique Delta) _West Action Taken: Work Stopped and compliance done .

  18. Severity 5- Non standard Man basket found at site (Unique Delta) _West Action Taken: Removed the Man basket from site , Builder to mobilize boom lift. .

  19. Severity 5- Life line bracket not available(Unique Delta) _West Action Taken: Stopped work and TBSLs standard life line pole provided.

  20. Severity 5-Life line Post not provided. (Popular Knitwear)_West Action Taken: Work stopped and Mobilized life line posts

  21. Severity 4-Rigger ascending & descending without anchoring lanyard. (Popular Knitwear)_West Action Taken: Work stopped and asked builder to provide ladder with fall arrestor

  22. Severity 4 & 5 observations May ’2010 South- TN

  23. Total severity 4 and 5 observations for the month of May.:- 21 Nos.

  24. BEFORE After Severity 4- : Primary member erected without lifeline post (Perlos, Chennai) _ TN Action Taken: Stopped work, Necessary fall protection arrangement provided .

  25. BEFORE NOW Severity 5- : Scaffolding provided for tie beam connection not having mid rail and top rail etc., (Perlos, Chennai) _ TN Action Taken: Stopped work, Scaffolding height increased, boomlift mobilised .

  26. BEFORE NOW Severity 5- : Column erected without bracing and steel guy ropes not used(Perlos, Chennai) _ TN Action Taken: Stopped work proper bracing provided for erected column, Asked to use only steel guy ropes .

  27. Severity 5- : Workers found working below suspended loads (Perlos, Chennai)_TN Action Taken : Stopped the activity and conducted training for all workers .

  28. Severity 4- : : Unsafe loading of primary member received at site (Perlos, Chennai)_TN Action Taken : Issue has been highlighted for necessary compliance to logistics team

  29. Severity 5- Workers not having safety harness while working at Height (Tappsemmi, Chennai)_TN Action Taken : Work stopped till compliance

  30. Severity 5- Scaffolds erected not having proper access & platform (Tappsemi, Chennai)_TN Action Taken : Work stopped till compliance, issued warning to Builder

  31. Severity 5- No proper access, no safety harness, no helmet (New Chennai)_TN Action Taken : Stopped the activity

  32. Severity 4 & 5 observations May ’2010 AP Region

  33. Total severity 4 and 5 observation for the month of May- 13 Nos

  34. Severity 4- Workers found working at height without any PPE (Grasim) _ AP Action Taken :Work stopped and explained the importance of PPE to the workers

  35. Severity 4- Roof access not proper erected and not anchored (Grasim) _ AP Action Taken : Worked stopped asked builder to provide proper access

  36. Severity 4- Worker found coming down the roof in a unsafe manner(Grasim) _ AP Action Taken : work stopped ,working at height training conducted for all workers

  37. Severity 4-Lifeline not tied on the 51st rafter (Ultra Tech)AP Action Taken: : Work stopped , Instructed Builder supervisor to provide the lifeline (Done)

  38. Severity 4- : Damaged ladder being found used at site (Ultratech) AP Action Taken: Ladder removed

  39. Severity 5-:Guide roper not tied to the column while it is been erected and area also not level for hydra movement (Carlsberg) AP Action Taken: Work stopped & guide rope provided

  40. Severity 4-Safety latch of the hydra not working (Carlsberg)AP Action Taken: Corrected

  41. Severity 4-: Loose materials like sag rods and deck sheets found lying at height (Carlsberg) AP Action Taken: All loose materials stacked in a proper manner to avoid flying of objects

  42. Severity 4 & 5 observations May ’2010 East Region

  43. Total severity 4 and 5 observation for the month of May- 30 Nos

  44. Before After Severity 5-: Scaffolding base was kept in loose soil. (M/s Bengal Shristi,)_East Action Taken: Hard surface(soling plate)with compacted soil provided under the base of scaffold.

  45. Severity 5-: Open cable joints (M/s Maa Amba, Kolkata)_East Action Taken: Industrial socket(Male- Female) provided .

  46. Severity 4-: Workers were getting down from rafter through brace rod.(Rozer plant, Raipur.)_East Action Taken: Work stopped immediately & provided roof access.

  47. Severity 5-: Improper Scaffolding -no access and no work platform (Rozer plant, Raipur.)_East Action Taken: Activity stopped and corrected

  48. Severity 4 & 5 observations May ’2010 North Region

  49. Total severity 4 and 5 observations for the month of May.:- 03 Nos.

More Related