An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Peter Wilson All Experimenters Meeting 27 Feb 2011 Changes to PPD Engineering Organization

  2. Re-Organization Principals and Motivations Focus on new projects: • Complete NOvA Construction • MicroBOONe Construction • Mu2e and G-2 Experiments • LHC Experiment Upgrades • LBNE Change in future detector needs suggest evolving focus of groups • Fewer large silicon trackers but work on CCDs (SiDet) • Focus on cyrogenic detectors (Mech Eng and Cryo Tech) Change of operations focus • Operate Intensity Frontier experiments • Operate Testbeam • Decommission CDF & D0 (short term) • Technicians redeploy to construction projects and detector development. Small impact on engineering Increase scientific staff engaged in operating these organizations February 27, 2012

  3. Jan 2011 PDD Div Office PDD Div Office X Electrical Engineering M. Larwill – Acting Head Electrical Engineering R. DeMaat - Head M. Larwill - Assoc Mechanical Engineering K. Krempetz – Head E. James - Deputy J. Kilmer – Assoc Mechanical K. Krempetz – Head J. Kilmer – Assoc Detector Development & Operations R. Ford – Head J. Estrada – Deputy J. Fagan – Assoc (G. Gutierrez – Assoc) (J. Kilmer – Assoc) Technical Centers R. Ford – Head J. Estrada – Deputy J. Krider - Assoc Alignment H. Friedsam – Head Site R. Ford – Head Feb 2012 http://www-ppd.fnal.gov/DivOffice/Org_Charts/February2012reorg.pdf February 27, 2012

  4. Alignment and Metrology AMD H. Friedsam – Head Geodesy (H. Friedsam– Ldr) Metrology G. Coppola – Ldr Data Management (H. Friedsam – Ldr) February 27, 2012

  5. Electrical Engineering EED M. Larwill – Acting Head Projects (M. Larwill – Ldr) Infrastructure and Support M. Matulick – Ldr Detector Electronics T. Shaw – Ldr ASIC Development G. Deptuch – Ldr Front-End Electronics (M. Larwill – Ldr) February 27, 2012

  6. Detector Development and Operations R. Ford – Head J. Estrada – Deputy Head (J. Kilmer), (G. Gutierrez), & J. Fagan – Assoc Heads Projects (R. Ford – Ldr) Detector Operarions (J. Fagan – Ldr) Exp. Assem. & Installation (J. Kilmer – Ldr) Detector Development & Fabrication (G. Gutierrez – Ldr) Experiment Ops D. Allen – Ldr Exp. Install. J. Voirin – Ldr Thin Film E. Hahn – Ldr Silicon Detectors (J. Estrada – Ldr) Project Testing & Comm. P. Simon – Ldr Exp. Prototyping D. Erickson – Ldr Scint. Detector Development A. Pla-Dalmau – Ldr Cryo & Vacuum Instrumentation (C. Kendziora – Ldr) Intensity Frontier and Test Beam M.A. Soha – Ldr Precision Metrology M. Roman – Ldr Rapid Prototyping & Special Material D. Butler – Ldr February 27, 2012

  7. Mechanical Engineering MED K. Krempetz – Head E. James – Deputy Head J. Kilmer – Assoc Head Design Drafting J. Rauch – Ldr Design Engineering J. Howell – Ldr Fluids and Thermal Engineering R. Rucinski – Ldr Projects K. Krempetz - Ldr Engineering Analysis R. Wands – Ldr Process Controls D. Markley - Ldr February 27, 2012

  8. Acknowledgements Reorganization not possible without work of many people in the division Planning effort over the past year by the engineering department heads: Bob, Horst, Kurt, and Rick Input from group leaders, scientific staff, technical staff Major effort by division office administrative staff to handle changes starting with input to planning through execution of all the changes Finally, this could never have been completed with the tremendous effort by Karen Kephart on all aspects of the reorganization February 27, 2012

  9. PPD Engineering Re-Organization Timeline Early 2011: Reorganization started with dissolving Site Dept (to ES&H, EED, TC) Nov 2011: Created Alignment and Metrology Dept Reorganized Electrical Engineering Dept Jan 2012: Created Detector Development and Operations from Technical Centers and technician groups of Mechanical Dept Renamed remainder of Mechanical Dept to Mechanical Engineering Dept A few groups merged, a few groups have new group leaders, a couple of new groups created Throughout 2012: Individuals move locations to fit with new groups and in one or two cases may have whole group find new space better suited to future. February 27, 2012