20 likes | 108 Views
*DRAFT* 308 Regional Haze SIP Development Road Map. #1 ID Antrop. Sources (d)(3)(iv). #3 List all BART-eligible Sources (e). #5 Determine Base Line Conditions (d)(2)(i). EPA Tracking Progress Guide. BART Report?. Base Case Models?. AofH ?. In&Near ?. #4 Analyze Improvement
E N D
*DRAFT* 308 Regional Haze SIP Development Road Map #1 ID Antrop. Sources (d)(3)(iv) #3 List all BART-eligible Sources (e) #5 Determine Base Line Conditions (d)(2)(i) EPA Tracking Progress Guide BART Report? Base Case Models? AofH ? In&Near ? #4 Analyze Improvement (e)(1)(ii)(B) #2 Complete EI Inventories (d)(4) CoH ? #6 Determine Natural Cond. (d)(2)(iii) EPA Natural Cond. Guide CALPUFF ? EDMS On-line? #7 Calculate Glide Path Unif. Improv. (d)(1)(B) Work Plan Forumla CALPUFF Alt? EDMS Data? GOTO #5 2018 Proj Models?
*DRAFT* 308 Regional Haze SIP Development Road Map, continued #8 Establish RP Goals (d)(1)(A) #10 Develop LTS (d)(3)(v) LTS Developed ? #11 Tie LTS To Goals, RP Yes Integral Vistas? (51.304) F1 Compl. Cost F1 RAVI, etc F4 Retiremt Repl. All CIAs Completed? F2 Time F2 Constr. Act. F5 SMP Ag/F GOTO #5 Existing SMP No F3 Energy,Non- Air F3 Schedules Limits F6 Enforcmt. Contr. #12 Tie to Regional and National Goal F4 Useful Life • #13 Other SIP Requirements: • 2008 SIP Revision (f) • 5 year periodic review (g) • 5 year adequacy (h) • (4) FLM Coordination (i) • and 51.302 • (5) NSR (51.307) NOTE: Flowchart does not show procedures for optional trading program (e)(2); development of goals for slower rate of progress (d)(1)(ii); resolution of goal disputes (d)(1)(iv); or where other States cause or contribute to impairment (d)(3)(i)-(iii). #9 Goal Consultation (d)(1)(iv)