An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Appraisal: Applications of NPV Corporate Finance 6

  2. Project appraisal: applications of NPV • The replacement decision/the replacement cycle • The calculation of annual equivalent annuities • The make or buy decision • Optimal timing of investment • Fluctuating output situations

  3. The replacement decision • Amtarc plc produces Tarcs with a machine which has a useful life of four more years before it will be sold for scrap, raising £10,000. • Q-2000 cost of £800,000 payable immediately. • Existing machine secondhand value: £70,000. • The Q-2000 will have a life of four years before being sold for scrap for £20,000. • Q-2000 has lower raw material wastage and its reduced labour requirements. • Selling price and variable overhead will be the same as for the old machine.

  4. Amtarc: accountant’s figures • Q-2000 reduces raw material buffer stocks by £120,000. • Redundancy payments of £50,000 will be necessary after one year. • The required rate of return is 10 per cent. • To simplify the analysis sales, labour costs, raw material costs and variable overhead costs all occur on the last day of each year.

  5. Amtarc plc • Required: • Using the NPV method decide whether to continue using the old machine or to purchase the Q-2000. • Note the irrelevant information: • Depreciation is not a cash flow • The book value of the machine is merely an accounting entry

  6. NPV Incremental cash flow table

  7. Replacement cycles

  8. Replacement cycles (continued)

  9. Replacement cycles: present values

  10. Replacement cycles: annual equivalent annuity PV or A = PV = A × af af –£9,845.98 Three-year replacement: = –£3,959.14 A = 2.4869

  11. Replacement cycles: AEAs

  12. When to introduce a new machine

  13. When to introduce a new machine (continued)

  14. Timing of projects

  15. The make or buy decision • Davis and Davies plc • Buy in the ‘eyes’ for the rods at £1 per set • Use 100,000 sets per annum • To produce their own ‘eyes’ • Spend £40,000 immediately on machinery etc. • Machinery will have a life of four years • Annual cost of production of 100,000 sets will be £80,000, £85,000, £92,000 and £100,000 respectively • Bought-in components estimates are £105,000 for year 1, followed by £120,000, £128,000 and £132,000 for years 2 to 4 respectively, for 100,000 sets per year • New machinery will be installed in an empty factory the open market rental value of which is £20,000 per annum • The firm’s cost of capital is 11 per cent

  16. The make or buy decision (continued)

  17. Fluctuating output • Potato Sorting Company • Summer and autumn: its two machines work at full capacity, which is the equivalent of 20,000 bags per machine per year • In the six months of the winter and spring the machines work at half capacity • Operating cost of the machine per bag is 20 pence • Very long productive life, yet no secondhand value • Fastsort has an identical capacity to the old machine but its running cost is only 10 pence per bag • Productive indefinitely • Cost £12,000 each to purchase and install

  18. Production manager’s plan to replace with 2 Fastsorts

  19. Production manager’s plan to replace with 2 Fastsorts (continued)

  20. Replacing only one old machine

  21. Lecture review • The replacement decision • Annual equivalent annuities (AEA) • Optimal replacement cycle • Whether to repair or buy a new machine • Timing of projects • Fluctuating output • Make or buy decision