Hybrid & Module Testing Status

Hybrid & Module Testing Status. Week of 6/6-6/10. UCSB Hybrid Testing Status. This Week: 1 shorts in PA Repairable 4 modules repaired. Cumulative: 1 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 2 noisy on edge channels Should be ok 1 Smashed APV-PA Bonds Repairable

mina
Download Presentation

Hybrid & Module Testing Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hybrid & Module Testing Status Week of 6/6-6/10

  2. UCSB Hybrid Testing Status

  3. This Week: 1 shorts in PA Repairable 4 modules repaired Cumulative: 1 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 2 noisy on edge channels Should be ok 1 Smashed APV-PA Bonds Repairable 6 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 4 with unknown failure Effects entire chip(s) UCSB Hybrid Testing Failures

  4. FNAL Hybrid Testing Status

  5. This Week: Cumulative: 7 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 1 Damaged during repair 5 Too Many Opens + Noisy 14 with unknown failure Effects entire chip(s) FNAL Hybrid Testing Failures

  6. US Hybrid Testing Status

  7. UCSB ARCS Testing Status

  8. This Week None Cumulative 2 with too much current 1 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV Repairable 1 with bad Dec. Mode chip UCSB ARCS Testing Failures

  9. UCSB ARCS Testing Results • 945 Total Tested • 936 Grade A • 3 Grade B • 6 Grade F • This week: • 10 of 44032 channels bad (0.023%) • Total Production: • 304.5 of 643328 channels bad (0.047%)

  10. FNAL ARCS Testing Status

  11. This Week (8387-8446, 60 modules). 1 mod, real pinholes (8417, chs 1,4,6,7 PASi pulled), OK. 1 mod 30 mkA at 15V (8421, ch 289 PASi pulled), OK. no PHL- 3 SHT (8411, 8430, 8434). Cumulative (7835-8446) 2 grade “B” (mishandling; missing bonds on p/a) 7970 - breakdown current behavior @430V Total of 14 pinholes Grade F – problem with chip #2 (every 8th channel is identified as PHL-) Grade F-High current 8289 Cumulative (7702-8446, 745 modules, ARCSed 744) 2 grade “B” (mishandling; missing bonds on p/a) 2 grade “F” mishandling 1 grade “F” under study 7970 - breakdown current behavior @430V FNAL ARCS Testing Failures

  12. FNAL ARCS Testing Results • 747 Total Tested • 737 Grade A • 2 Grade B • 5 Grade F • This week: • Total Production:

  13. US ARCS Testing Status

  14. UCSB LT Testing Status Failed module has too much current

  15. FNAL LT Testing Status • Modules 30200020008325 – 8345, 8425-8434, 8413-8422 • were tested during June 9 – June 13. • We did 4 runs. • K-Mux errors were happening two times – only in the beginning of new run, program had to be restarted • Quick connect between hose and coldbox was damaged and leaking. Replaced quick connect and renewed the liquid – delay in one run. • Module 8348 had high leakage current (~2.8uA@450V) and steeper then usual. • Modules 8331, 8336-8345, 8431 had high noise in the cold record (~3.5ADC) -> all channels marked NOISY -> xml :-1: • Possible reason – no HV bias during cold cycle. Need more quiet time to investigate. • Backlog: 54 modules

  16. FNAL LT Testing Status

  17. US LT Testing Status