80 likes | 247 Views
CIGRE SC B5 Protection and Automation 24 Novembre 2010, Latina. 1. 1. Latina, 24 novembre 2010. CIGRE SC B5 Protection and Automation. ORGANIZZAZIONE. Study committee B5 covers principles, design, applications, coordination, performance and asset management of: - System Protection;
E N D
CIGRE SC B5Protection and Automation24 Novembre 2010, Latina 1 1 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation ORGANIZZAZIONE Study committee B5 covers principles, design, applications, coordination, performance and asset management of: - System Protection; - Substation Control and Automation; - Remote Control Systems and Equipment; - Metering Systems and Equipment; All technical, organisational and economical aspects are considered including staff education and training. Emphasis is placed on design and application of digital technology and modern integrated system approach including hardware and software for the acquisition of system state information, local and remote data communication, and execution of control commands. 2 2 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation ORGANIZZAZIONE 3 3 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation INDIRIZZI PER LE FUTURE ATTIVITA’ DEL COMITATO: COLLOQUIUM 2011 PS 1 IEC 61850: Which tool for which user Engineering Tool expanding from specification over maintenance to decommissioning Identification of user groups and mapping of the roles (responsibilities) to tool requirements Engineering tools: general and specific requirements for each user profile Interfaces between engineering tools and other applications PS 2: Protection of hybrid line and cable Parameters calculations and measures for zero sequence impedance of cables Special requirements for protection algorithms/reliability/performance Protection and communication schemes for underground cables. GIL and composite lines PS 3: Performance of protection systems while the network is under stress Performance indices and their acceptable limits Software tools and systems for performance evaluation of protection systems Behaviour during major disturbances: case study of real events Consequences of maloperations and possible improvements 4 4 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation INDIRIZZI PER LE FUTURE ATTIVITA’ DEL COMITATO: SYMPOSIUM 2011 LA MEMORIA B5 ITALIANA Topic: Towards the power system of the future; Title: The automation of the future networks: from the substation automation to the grid automation. Some real examples showing how the adoption of digital technology and international standards can contribute to integrate new functions, related to the grid control, in the substation control system (load shedding, local balancing, WAMS,WAP). The use of the IEC 61850 model for the exchange of information between transmission, distribution and generation plants. LA MEMORIA DEL B5 Topic: Towards the power system of the future; Title: Coordination of protection and control of future network The impact of increasing grid load, new types of equipments such as FACTS, SVC, Power Storage and Dispatchable Loads, Renewable Energy Sources (RES) and Dispersed Generation (DG) on the protection and control systems and the need for their modification and adaptation. 5 5 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation GRUPPI DI LAVORO DI PROSSIMO AVVIO PIU’ INTERESSANTI PER IL SETTORE NAZIONALE B5.42: Experience concerning availability and reliability of DSAS - Collection of experience feedback for Digital SAS, focused on availability and reliability, based on an end-user survey; - Classification of information according to specification, design, development, hardware, software, testing, operation, maintenance, evolution, project documentation; - Recommendations for users, vendors and system integrators applicable to SAS specification, design, architecture, operation and maintenance and related utility organisation. 6 6 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation GRUPPI DI LAVORO DI PROSSIMO AVVIO PIU’ INTERESSANTI PER IL SETTORE NAZIONALE B5.43: Coordination of protection and control of future network The interaction between protection and automation and power networks of the future: - dynamic relay coordination and verification; - islanding and stability; - control (sharing and allocation of functions); - communication requirements; - DER dispatch; - FACTS / SVC / Power Storage. 7 7 Latina, 24 novembre 2010
CIGRE SC B5 Protection and Automation TEMI PRINCIPALI PER LA SESSIONE 2012 1) IMPACT OF FUTURE NETWORK COMPONENTS ON COORDINATION OF PROTECTION AND AUTOMATION SYSTEMS - Local and system wide coordination of protection and control for FACTS, Static Var Compensator, Storage and Dispersed Energy Resources; - Dynamic relays coordination and verification; - Sharing and allocation of protection, control and automation functions; - Communication requirements. 2) UTILISATION AND APPLICATION OF REMOTE ACCESS FOR PROTECTION AND AUTOMATION SYSTEMS - Actual practice, improvements and new opportunities for real time and off line operations and management, including remote testing, maintenance and adaptive protection; - Bidirectional management of information including fault recording, SAS configuration, setting and testing; - Automatic data retrieval, analysis and operational response; - Implementation of security measures. 8 8 Latina, 24 novembre 2010