Team 8: Grand River Rapids

Team 8: Grand River Rapids. Team 8. Aaron Vanderhill. Jim Barron. Jeff Van Laar. Tom Marshall. Outline. Project Overview Design Norms Major Design Decisions HEC-RAS Modeling Entry and Exit Points Future Work Questions. Project Overview.

minty
Download Presentation

Team 8: Grand River Rapids

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 8: Grand River Rapids

  2. Team 8 Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall

  3. Outline • Project Overview • Design Norms • Major Design Decisions • HEC-RAS Modeling • Entry and Exit Points • Future Work • Questions

  4. Project Overview • Return the Grand River to a more natural state • Replace beautification dams with rocks • Eliminate dangerous undertow at 4th street dam • Design entry and exit locations for kayakers

  5. Design Norms • Caring • Eliminate dangers associated with dams • Justice • Respect rights of fishermen and property owners • Stewardship • Naturalize river • Improve fish habitat

  6. Major Design Decisions • Flow Rate • River used between April and November • Low flow = 1,700 cfs • High flow = 50,000 cfs (100 year storm) • Design flow of 3,200 cfs

  7. Major Design Decisions • Modeling Accuracy • Rocks & boulders as series of weirs

  8. Project Location

  9. 4th Street Dam Safety Hazard

  10. Design Solution – Stairstep

  11. Entry and Exit Points Fish Ladder Park Canal Street Park Fulton Street Ford Museum

  12. Future Work • Continued modeling of rocks • Maintaining water levels • Refine physical model

  13. Questions