An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction & Up-date 20th August 2012

  2. Contents • The Background • The Teams • The Facilities • Location & Layout • The Planning • Communications • Your Input

  3. The Background • Current Campus Designed for Max Capacity of 1200 students • We are now c.1150 & growing • Campus Master Plan - completed 2008 • Find it on InsideASH>Search “Campus Master Plan” • Historically 5 small locations in & around The Hague • New Campus 20 years ago • MS “temporary” wing added 15 years ago • New ES Wing in 2003 • Purchased Land from Municiapality of Wassenaar for ECC • Boerderij (farm) Ter Weer (area name) • Located on small Deijlerweg, 5/7 minutes walk • Construction commenced early 2102

  4. The Background • The key parties in the negotiations: • Municapality of Wassenaar – owned the land & • farmhouse “Boerderij Ter Weer” • SJW Youth Club had clubhouse in the Farmhouse - were already being re-located by Gemeente • Olympia ‘72 Handball Club will share sports facilities • ASH – now own land & buildings

  5. Location & Layout

  6. Location & Layout

  7. The Planning • Ground cleared & prepared late 2011/ early 2012 • Groundbreaking Ceremony took place 16th February 2012 • Handball fields complete (for new handball season) • Construction drawings & foundation work completed over the summer - passed a key risk phase • Sport complex and Gym due for completion • end of December 2012 • Main ECC instructional areas doe for • completion July 2013. • Currently on schedule – weather permitting • Now: Fixtures & Fittings & Landcaping

  8. The Teams • ASH • ECC Project Team • Tim Messick, Ton Ravensbergen, Rick Spradling, Hans Carmiggelt, Lesley Murphy, Project Managers (External) • ECC Design Team • Tim Messick, Fereshteh Dastani, Matthew Steuer, Ann Pleij, • Carla Bruzual, Hans Carmiggelt, Project Managers • External • Project Manager – Themelion • Arjen Brandon, Marije Bierenbroodspot • Architect – Kraaijvanger Urbis • Hans Goverde • Landscape Architect – recently selected • Design Studio Van Ginneken

  9. Communications

  10. Your Input • Thank you for you valuable input to date. We welcome your ideas about any aspect of the project: • Contact a member of The Design Team or The Project Team • Watch out for up-dates on the website, InsideASH & PTO Bulletin • Check out the model in the main entrance • Get students involved • Direct non-staff members with inquiries to email: ecc@ash.nl • Let us know in advance when you would like to visit – we’ll pick time slots per week - hard hats must be worn at all times on the construction site.