HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis. Cedric Baud. For memory: Scientific Motivation. To test equipment under the worst case conditions it may encounter in case of full beam impact To validate the diluting materials used in TPSG4
E N D
HRMT-06 TPSG4/MSE dismantling from TNL planned post experimental analysis Cedric Baud HiRadMat Operations meeting 5/3/2014
For memory: Scientific Motivation • To test equipment under the worst case conditions it may encounter in case of full beam impact • To validate the diluting materials used in TPSG4 • To demonstrate the MSE is properly protected by TPSG4 • To benchmark advanced numerical simulations HiRadMat Operations meeting 5/3/2014
Test setup overview MSE TPSG4 Beam HiRadMat Operations meeting 5/3/2014
The real deal! HiRadMat Operations meeting 5/3/2014
Dismantling procedure mentioned in the safety file of HRMT#6, presented during safety review of 28/9/2012. Phase Post-Irradiation et Démontage HiRadMat Operations meeting 5/3/2014
RP Analysis Estimated dose (06/2012) Real dose(11/2012) MSE TPSG4 HiRadMat Operations meeting 5/3/2014
Proposed planning April 2014 • Week 14: leak test of MSE in TNL (20bar He). • Week 15: removal equipment from TNL: • MSE -> blg 955 • TPSG4 -> blg 867 • hydraulics rack and electronics and frames -> blg 955 • Wk 16: removal of TPSG4 from vacuum vessel in bunker of blg 867 for visual inspection. • Wk 17: planning of repair of TPSG4 (worst case), insertion of TPSG4 in tank to be stored in blg 955. HiRadMat Operations meeting 5/3/2014
Radioprotection related issues • WDP, to be done still • IMPACT, to be created for HRMT. A separate one for 867? • Specific RP requirements for bunker? HiRadMat Operations meeting 5/3/2014