An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Extreme Programming:From Theory to Practice Brett Peterson Chief Architect & VP of Development VisionShare Inc.

  2. XP Theory • Kent Beck – “Extreme Programming Explained, Embrace Change” • Succinct, practical book • I read it in 2001. • Resonated with me based on software development process issues I’d noticed since 1992 • This discussion based on the 1st edition

  3. XP Theory: Overview • Take proven practices and turn them up to 10 • Practice them all the time, down to the minute-by-minute level • Hence the name "Extreme" • Arguably more disciplined than traditional approaches • Exact opposite of the "cowboy approach"

  4. XP Theory: Cost of Change Curve

  5. XP Theory: Cost of Change Curve • Want to be able to make large changes late in product life cycle • Only implement what is needed • Increase chances of getting it right • Flatten the cost of change curve through technology and practices • Simple design without unnecessary extras • Automated tests • Practice of constant refactoring

  6. XP Theory: Four Values • Value 1: Communication • Bad communication is the primary cause of incorrect software • Customer to Dev Team and Dev Team to Customer • Metrics help customer determine progress • Within Dev Team

  7. XP Theory: Four Values • Value 2: Simplicity • Always create the simplest solution that could possibly work • Be confident that one can successfully implement tomorrow's needs

  8. XP Theory: Four Values • Value 3: Feedback • Customer to Dev Team • Current state of the system (tests) • Value 4: Courage • Fixing systemic flaws • Adding invasive features with confidence • Plus the Foundation: Respect • Team dynamics are critical

  9. XP Theory: Twelve Practices • Turn them all up to 10 and do them constantly • Done together they: • Flatten the cost of change curve • Increase quality • Increase concrete output (working software) • Increase speed of results by only doing the simplest piece necessary • Increase resource efficiency by only doing what is necessary and getting immediate feedback on what is correct and incorrect

  10. XP Theory: Twelve Practices • The Planning Game • On-site customer • Small Releases • Testing • Pair Programming • Simple Design

  11. XP Theory: Twelve Practices • Refactoring • Continuous Integration • Metaphor • Collective Ownership • 40 hour week • Coding standards

  12. XP Practice: The Beginning • 2002: Core group of 5 developers committed to trying XP in full • Found a room amenable as an XP lab • Kept cubicles • Effectively unused – phone only • Educated upper management on XP • Obtained XP lab funding for tables, monitors, keyboards, mice, docking stations

  13. XP Practice: The Beginning • Moved to a new company (VisionShare) in late 2004. • Instituted XP there as well • Will intermingle both experiences throughout this discussion • Very different experiences and resulting decisions

  14. XP Practice: Initial Decisions • Debate: PCs or laptops? • Had been using laptops • XP Theory seemed to imply PCs configured with identical development environments • Stuck with laptops • Couldn’t justify hardware purchase • Was later considered a good decision

  15. XP Practice: Initial Decisions • Debate: Lab hours • We had developers in from 6:00am to 3:00pm, and others in from 9:00am to 6:00pm • Decided on core lab hours of 9:00am to 3:00pm • Did not want to sacrifice respect for the individual at the alter of XP theory • Enough overlap existed to make it work

  16. XP Practice: Initial Decisions • Debate: Work Tracking Mechanics • Notecards or whiteboard? • I saw almost no value in notecards, but others on the team disagreed • I could not fathom planning via paper • Tool? • No good XP tools on the market at that time. • Found a few open-source, extensible issue tracking systems

  17. XP Practice: Initial Decisions • Debate: Work Tracking Mechanics • Decided to significantly extend an open source PHP-based web issue tracking system called mantis • Designed out the minimal attributes and views to get started • Implemented as a side project with continuous improvements over time • Still in active use today, 6 years later

  18. XP Practice: Mantis Extensions • Categorization of mantis issues into one of three hierarchically organized types • Requirement (Defined the “what”) • Story (Refined the “what” and added some “how”) • Task (unit of work for a developer) • Requirements contained stories which contained tasks • Removed tasks in early 2006

  19. XP Practice: Mantis Extensions • Fields for time tracking on tasks • Rolled up through report views into stories • Developers tracked “Ideal Engineering Hours (IEH)” • Actual design and coding (not email or meetings) • Developers daily updated all tasks with updated IEH numbers • Each developer required to produce six IEH per day on average

  20. XP Practice: Mantis Extensions • Iteration Views • An “iteration” is a time period between planning meetings • We settled on 4 week iterations • An iteration view showed all work planned for (or completed in) an iteration

  21. XP Practice: Mantis Extensions • Daily progress percentages • All views showed the % complete of specific stories, tasks, or groupings of them (e.g., % complete of an iteration) • Allowed team leader to track and react to unexpected IEH expenditure on a daily basis if needed • Critical that developers accurately represent IEHs used and remaining IEH usage expected

  22. XP Practice: Mantis Extensions • Easy movement of stories and tasks from one iteration to another • Critical for a smooth planning meeting (discussed later) • Screenshots on following pages

  23. Main XP Page

  24. Stories by Require-ment for an iteration

  25. A Require-ment broken into stories

  26. Iteration Progress Metrics at Bottom

  27. Example Mantis Require-ment Utilizing Attach-ments

  28. Example Mantis Require-ment’s Relation-ships and Bug Notes

  29. XP Practice: Planning Process • Spreadsheet calculates target IEH for a team for an iteration • Considers vacations, sick, and 6 IEH quota • Estimation Meeting • Held on Thursday of the last week of an iteration • Dev team creates group estimates for all stories and continues stories that may need more time into the next iteration

  30. XP Practice: Planning Process • Planning Meeting • Run by product manager • All stakeholders have a seat • Plan the work for the upcoming iteration (based on estimates and a target IEH goal) • Mantis “move item” functionality is useful • Review Meeting (eliminated) • Demonstrate results of previous iteration to all stakeholders

  31. XP Practice: Issues • Customer Representative role • Not well filled • Universally a “bad thing” to leave unfilled • Leads to high levels of inefficiency in development and frustration with customers/sales • Filled now at VisionShare with very competent product management

  32. XP Practice: Issues • Design Documentation • How much to produce? • Keep it up to date? • Is the code the ultimate expression of the design? • Best way to educate new developers? • We decided in both companies to mostly use design documentation in a transient capacity

  33. XP Practice: Introducing XP • Buy-in was very high at first company where the initiative started. • Everyone willing to live through rough spots • Buy-in from second company where process was transplanted was mixed. • Additional developers from first company joined the second company

  34. XP Practice: Introducing XP • Issues at new company • Pair programming • Common tables/workstations • Daily standup meetings • Test-first coding • “Big brother” – time tracking • Planning process and mantis brought immediate results

  35. XP Practice: Introducing XP • Compromises made at new company • Never enforced pair programming • Did enforce common tables/workstations • Introduced continuous integration and unit testing • Partially successful at test-first coding • Used time reporting for roll up and planning reasons only

  36. XP Practice: Lessons Learned • Every developer needs to be committed to every XP principle that is practiced • Compromise can potentially be used if the situation requires it, but it significantly reduces the benefit of full XP • One uncooperative person can cause significant disruption • Respect for the individual must be balanced against team needs

  37. XP Practice: Lessons Learned • The XP on-site customer role is critically important • Immediate feedback on questions • Accurate requirements • Planning process works more smoothly • Open lab environment is distracting to some and liberating to others • Did significantly increase communication

  38. XP Practice: Lessons Learned • Pair programming lessons • Is exhausting when done correctly • 6 to 8 hours maximum per day • Normal mental breaks don’t occur • Can poison a team if personalities clash • Difficult to hire confidently when pair programming is a requirement

  39. XP Practice: Lessons Learned • Discipline and conformance • XP demands conformance • Core hours, lab environment, etc… • Viewed by some personalities as heavy handed, especially time tracking • Lack of discipline in time tracking causes significant difficulties in planning • Don’t go overboard • You don’t want robots

  40. XP Practice: Lessons Learned • My top observations after 6 years and two XP environments • The “on-site customer” is the most important practice • Building an XP process requires complete commitment from all developers & mgmt • Individual resistance is magnified due to the interactive nature of the process • Start organically with a committed group

  41. Thank you! Questions?