An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contribution to theNRMM PEMS Programme Considerations By Euromot / CECE / CEMA Brussels 21 April 2008 2nd Meeting NRMM PEMS Expert Group www.euromot.org

  2. NRMM Industry’s View on the Program Scope • The program aims for investigating in-use testing provisions for NRMM Stage IV • For a significant amount of engines used in certain type of machinery compliance will continue to be demonstrated by CoP • Two-step approach suggested: focus on in-service conformity prior to in-use compliance provisions • Consideration of health & safety aspects, design and operational constraints will require to set up selection and de-selection criteria for certain types of equipment www.euromot.org

  3. NRMM Industry’s View on NRMM PEMS (Cont’d) • Availability of equipment and technical feasibility • The amount of modifications required for installing PEMS units on user-owned equipment will be restricted • NRMM industry will provide Stage IIIA technology • Measurements to focus first on gaseous compounds • Low priority on gensets: in-use profiles close to test bed operation, no aftertreatment requirements • Required to consider ongoing US activities and review with US EPA www.euromot.org

  4. Proposed Applications • Selection criteria: - Address construction and agricultural - Focus on high sales volume applications - Set up lower cap at 56 kW due to NRMM Stage IV scope • Additionally, check feasibility on skid-steer loaders and mini excavators <56 kW • Amount of modifications required for mounting and running test equipment • Health & safety aspects, design and operational constraints www.euromot.org

  5. Program Logistics • Contributions confirmed • Equipment: Volvo CE, JCB, CNH, Caterpillar, John Deere, Scania, Fendt, (Liebherr) • Engine manufacturers' support to OEM: Deutz, Cummins, Fiat Powertrain • List non-exclusive, more to join subject to further details of the work program • Individual contributions tbd, ensure sample sizes >1 • Preferred route • Manufacturers will provide equipment and staff for tests to be conducted at their premises • JRC will provide PEMS units and staff to operate • A Euromot/CECE/CEMA task force will steer the program from engine and equipment manufacturers' side www.euromot.org

  6. Operating Cycles • Objective: • Generate sample data based on application specific, regular activity • NRMM industry is not proposing to develop test cycles for in-use testing • Typical load profiles are publicly available or can be derived in a straightforward manner • Wheel loaders, excavators, harvesters: move to site + perform standard operations • Tractors: road operation, high load (ploughing), low load (seeding) • Backhoe loaders: road operation, excavating with backhoe, loading with front bucket • Industry will support setting up appropriate cycle data www.euromot.org